Permanent tunnel support with reinforced shotcrete arches and forepoling in over-consolidated till and weathered rock. A case study based on the construction of the Bergås tunnel, Norway

• Reinforced shotcrete arches can function as permanent support in soil tunnelling. • Compacted and stiff tills of Norway provide stability under tunnel excavation. • Innovative use of RRS-support can substitute cast concrete liners in soil tunnels. • Optimal support design in soil tunnels demands elaborated designs and monitoring. • Significant cost savings can be achieved from the use of reinforced shotcrete. Ground support in tunnels excavated through weak ground conditions in Norway has normally consisted of reinforced shotcrete methods. However, in cases where exceptionally poor ground or soil tunnel conditions were expected, final support consisted of cast-in-place solutions designed in advance. Although reinforced shotcrete methods have proved satisfactory for a wide range of weak ground conditions, the adequacy of such support method solely to act as the final, permanent support and fully substitute cast concrete liner in soil tunnels has not been realized until the recent construction of the Bergås highway tunnel in northern Norway. In this tunnel, an unexpected portion of 70 linear m of the tunnel consisted of sedimentary deposits of glacial origin (tills) and a weathered, soil-like rock mass. In the present study, the ground behavior and the performance of reinforced shotcrete arches as permanent, final support in this soil portion are investigated. The findings suggest that the compact and over-consolidated tills pose favorable excavation conditions as evidenced by the monitored ground stability under full face excavation passes, and the low support loading during the advance through the soil zone. As such, a pragmatic design considering a permanent functional and stable ground support made of reinforced arches in the soil section was possible from the combination of the elements of the Scandinavian hard rock tunnelling with the principles of weak ground engineering, and pre-stabilization methods with grouted forepoling. The permanent tunnel support finally consisted of ribs of reinforced shotcrete (RRS), fiber reinforced shotcrete (FRS) and fully grouted steel rebar rock bolts, which substituted the pre-determined cast concrete lining that is traditionally used in soft tunnelling conditions. The approach is therefore innovative as it considers a cost-effective alternative with significantly lower concrete consumption, on the basis of a shotcrete-based support solution designed from a combination of elaborated design work, monitoring, ground characterization, and advanced numerical analyses.

Authors

Institutions

Publication Details

Journal
Tunnelling and Underground Space Technology
Published
2024-12-19
DOI
https://doi.org/10.1016/j.tust.2024.106256
Citations
5
Primary Topic
Rock Mechanics and Modeling
Type
article
Field-Weighted Citation Impact
1.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Permanent tunnel support with reinforced shotcrete arches and forepoling in over-consolidated till and weathered rock. A case study based on the construction of the Bergås tunnel, Norway

Alf Kristian Lund, Bent Aagaard, Karl Gunnar Holter, Jorge Terron‐Almenara et al.
5 citations
Tunnelling and Underground Space Technology
Rock Mechanics and Modeling
1.35
article

Permanent tunnel support with reinforced shotcrete arches and forepoling in over-consolidated till and weathered rock. A case study based on the construction of the Bergås tunnel, Norway

Alf Kristian Lund, Bent Aagaard, Karl Gunnar Holter, Jorge Terron‐Almenara, Pål Drevland Jakobsen
article en
5 citations

Abstract

• Reinforced shotcrete arches can function as permanent support in soil tunnelling. • Compacted and stiff tills of Norway provide stability under tunnel excavation. • Innovative use of RRS-support can substitute cast concrete liners in soil tunnels. • Optimal support design in soil tunnels demands elaborated designs and monitoring. • Significant cost savings can be achieved from the use of reinforced shotcrete. Ground support in tunnels excavated through weak ground conditions in Norway has normally consisted of reinforced shotcrete methods. However, in cases where exceptionally poor ground or soil tunnel conditions were expected, final support consisted of cast-in-place solutions designed in advance. Although reinforced shotcrete methods have proved satisfactory for a wide range of weak ground conditions, the adequacy of such support method solely to act as the final, permanent support and fully substitute cast concrete liner in soil tunnels has not been realized until the recent construction of the Bergås highway tunnel in northern Norway. In this tunnel, an unexpected portion of 70 linear m of the tunnel consisted of sedimentary deposits of glacial origin (tills) and a weathered, soil-like rock mass. In the present study, the ground behavior and the performance of reinforced shotcrete arches as permanent, final support in this soil portion are investigated. The findings suggest that the compact and over-consolidated tills pose favorable excavation conditions as evidenced by the monitored ground stability under full face excavation passes, and the low support loading during the advance through the soil zone. As such, a pragmatic design considering a permanent functional and stable ground support made of reinforced arches in the soil section was possible from the combination of the elements of the Scandinavian hard rock tunnelling with the principles of weak ground engineering, and pre-stabilization methods with grouted forepoling. The permanent tunnel support finally consisted of ribs of reinforced shotcrete (RRS), fiber reinforced shotcrete (FRS) and fully grouted steel rebar rock bolts, which substituted the pre-determined cast concrete lining that is traditionally used in soft tunnelling conditions. The approach is therefore innovative as it considers a cost-effective alternative with significantly lower concrete consumption, on the basis of a shotcrete-based support solution designed from a combination of elaborated design work, monitoring, ground characterization, and advanced numerical analyses.

Tunnelling and Underground Space TechnologyVol. 157
Norwegian Geotechnical Institute (NO), Norwegian University of Science and Technology (NO)
Sustainable cities and communities
Openalex Percentile: Top 22%
Rock Mechanics and Modeling
1.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.