Updated results of a life cycle assessment of the ISIS-II Neutron and Muon Source

The ISIS-II Neutron and Muon Source is the proposed next generation of, and successor to, the ISIS Neutron and Muon Source based at the Rutherford Appleton Laboratory in the United Kingdom. Anticipated to start construction in 2032, the ISIS-II project presents a unique opportunity to incorporate environmental sustainability practices from its inception. A (simplified) Life Cycle Assessment (LCA) will examine the environmental impacts associated with each of the ISIS-II design options across the stages of the ISIS-II lifecycle, encompassing construction, operation, and eventual decommissioning. This proactive approach will assess all potential areas of environmental impact and seek to identify strategies for minimizing and mitigating negative impacts, wherever feasible. This talk will provide insights into the motivation, methodology, and first results of the environmental impact and LCA of the entirety of the ISIS-II project.

Authors

Publication Details

Published
2024-12-19
DOI
https://doi.org/10.22323/1.476.1236
Primary Topic
Muon and positron interactions and applications
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Updated results of a life cycle assessment of the ISIS-II Neutron and Muon Source

H. M. Wakeling
Muon and positron interactions and applications
article

Updated results of a life cycle assessment of the ISIS-II Neutron and Muon Source

H. M. Wakeling
article en

Abstract

The ISIS-II Neutron and Muon Source is the proposed next generation of, and successor to, the ISIS Neutron and Muon Source based at the Rutherford Appleton Laboratory in the United Kingdom. Anticipated to start construction in 2032, the ISIS-II project presents a unique opportunity to incorporate environmental sustainability practices from its inception. A (simplified) Life Cycle Assessment (LCA) will examine the environmental impacts associated with each of the ISIS-II design options across the stages of the ISIS-II lifecycle, encompassing construction, operation, and eventual decommissioning. This proactive approach will assess all potential areas of environmental impact and seek to identify strategies for minimizing and mitigating negative impacts, wherever feasible. This talk will provide insights into the motivation, methodology, and first results of the environmental impact and LCA of the entirety of the ISIS-II project.

Science and Technology Facilities Council
Zero hunger
Openalex Percentile: Top 74%
Muon and positron interactions and applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.