Testing towards first preproduction ITk Pixel detector units

For the upgrade of the LHC to the High-Luminosity LHC, the ATLAS inner detector will be replaced with an all-silicon detector, the Inner Tracker (ITk). The innermost part of the ITk will consist of a pixel detector with five layers that will consist of modules combined into serially powered (SP) chains and loaded on ring and stave shaped low mass carbon-fiber local supports (LLS). During 2024, the ITk Pixel project will be in the preproduction period and multiple loading sites will integrate modules on LLSs. Testing these significantly sized and feature-complete detector units is a major challenge and essential in order to ensure their electrical and thermal performance. This contribution describes the development of a large-scale detector test setup detailing on the general infrastructure, the control and monitoring system as well as the readout system. The testing routines will be summarized in this contribution.

Authors

Institutions

Publication Details

Published
2024-12-17
DOI
https://doi.org/10.22323/1.476.0953
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Testing towards first preproduction ITk Pixel detector units

Hans Ludwig Joos
Particle Detector Development and Performance
article

Testing towards first preproduction ITk Pixel detector units

Hans Ludwig Joos
article en

Abstract

For the upgrade of the LHC to the High-Luminosity LHC, the ATLAS inner detector will be replaced with an all-silicon detector, the Inner Tracker (ITk). The innermost part of the ITk will consist of a pixel detector with five layers that will consist of modules combined into serially powered (SP) chains and loaded on ring and stave shaped low mass carbon-fiber local supports (LLS). During 2024, the ITk Pixel project will be in the preproduction period and multiple loading sites will integrate modules on LLSs. Testing these significantly sized and feature-complete detector units is a major challenge and essential in order to ensure their electrical and thermal performance. This contribution describes the development of a large-scale detector test setup detailing on the general infrastructure, the control and monitoring system as well as the readout system. The testing routines will be summarized in this contribution.

European Organization for Nuclear Research (CH), University of Göttingen (DE)
Openalex Percentile: Top 93%
Particle Detector Development and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Testing towards first preproduction ITk Pixel detector units — Hans Ludwig Joos · (2024) | TGRS Research Map | TGRS