Summary of the ATLAS ITk strip tracker module pre-production

During the High-Luminosity Large Hadron Collider upgrade, the current ATLAS Inner Detector will be replaced with the new Inner Tracker in order to cope with the increased track density, harsher radiation environment and higher data rates. The ITk is designed to be an all-silicon tracking detector with a strip detector surrounding the inner pixel detector. The strip tracker will consist of a central barrel detector with four layers (12,000 modules total), and two end-caps, consisting of six discs each (7,000 modules total). The 19,000 modules required for the full detector will be assembled over the course of a production phase planned to last 50-54 months. Before that, 5% of the module production volume was assembled in order to exercise the full assembly and quality control chain. This contribution presents an overview of the pre-production phase results and discusses issues encountered, which are critical for ensuring the success of the upcoming production phase.

Authors

Publication Details

Published
2024-12-17
DOI
https://doi.org/10.22323/1.476.0939
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Summary of the ATLAS ITk strip tracker module pre-production

J. J. Teoh
Particle Detector Development and Performance
article

Summary of the ATLAS ITk strip tracker module pre-production

J. J. Teoh
article en

Abstract

During the High-Luminosity Large Hadron Collider upgrade, the current ATLAS Inner Detector will be replaced with the new Inner Tracker in order to cope with the increased track density, harsher radiation environment and higher data rates. The ITk is designed to be an all-silicon tracking detector with a strip detector surrounding the inner pixel detector. The strip tracker will consist of a central barrel detector with four layers (12,000 modules total), and two end-caps, consisting of six discs each (7,000 modules total). The 19,000 modules required for the full detector will be assembled over the course of a production phase planned to last 50-54 months. Before that, 5% of the module production volume was assembled in order to exercise the full assembly and quality control chain. This contribution presents an overview of the pre-production phase results and discusses issues encountered, which are critical for ensuring the success of the upcoming production phase.

Openalex Percentile: Top 93%
Particle Detector Development and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.