Multi-objective optimization in an identical parallel flow shop scheduling problem with waiting time constraint

The Operations Research community has grown interested in scheduling problems within flow shop systems. Despite this, the Identical Parallel Flow Shop Scheduling Problem (IPFSSP) remains underexplored, especially with multiple objective functions. This paper aims to bridge this gap by developing a scheduling strategy for an Identical Parallel Flow Shop Scheduling Problem with a bicriteria objective, focusing on Makespan and the total Earliness and Tardiness of jobs while considering Waiting time constraint. The study employs both a priori and a posteriori methods to address the problem. The main contribution of this work is the integration of algorithmic components designed to balance the loads across flow shop lines within the proposed algorithms. A series of test instances are utilized to evaluate the performance of the proposed algorithms, which is then compared to a lower bound. Experimental results demonstrate that each method presents distinct advantages and limitations regarding convergence, optimality, and computation time for addressing multi-objective IPFSSP challenges.

Authors

Publication Details

Journal
STUDIES IN ENGINEERING AND EXACT SCIENCES
Published
2024-12-12
DOI
https://doi.org/10.54021/seesv5n2-752
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective optimization in an identical parallel flow shop scheduling problem with waiting time constraint

Younes Bahmani, Milad Mansouri, Hacene Smadi
STUDIES IN ENGINEERING AND EXACT SCIENCES
Scheduling and Optimization Algorithms
article

Multi-objective optimization in an identical parallel flow shop scheduling problem with waiting time constraint

Younes Bahmani, Milad Mansouri, Hacene Smadi
article en

Abstract

The Operations Research community has grown interested in scheduling problems within flow shop systems. Despite this, the Identical Parallel Flow Shop Scheduling Problem (IPFSSP) remains underexplored, especially with multiple objective functions. This paper aims to bridge this gap by developing a scheduling strategy for an Identical Parallel Flow Shop Scheduling Problem with a bicriteria objective, focusing on Makespan and the total Earliness and Tardiness of jobs while considering Waiting time constraint. The study employs both a priori and a posteriori methods to address the problem. The main contribution of this work is the integration of algorithmic components designed to balance the loads across flow shop lines within the proposed algorithms. A series of test instances are utilized to evaluate the performance of the proposed algorithms, which is then compared to a lower bound. Experimental results demonstrate that each method presents distinct advantages and limitations regarding convergence, optimality, and computation time for addressing multi-objective IPFSSP challenges.

STUDIES IN ENGINEERING AND EXACT SCIENCESVol. 5(2)
Industry, innovation and infrastructure
Openalex Percentile: Top 66%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multi-objective optimization in an identical parallel flow shop scheduling problem with waiting time constraint — Younes Bahmani, Milad Mansouri, et al. · STUDIES IN ENGINEERING AND EXACT SCIENCES (2024) | TGRS Research Map | TGRS