Design of PV system peak power adjustment based on measured data

The maximum power production limit is assigned to licensed clients with photovoltaic (PV) system. For safety reasons this limit is mainly determined to be equal to the PV system power output limit. The limit does not have to be the same as installed PV system power. Maximum power of electric energy delivered to distribution network will depend on client’s consumption behavior, as PV system production will primarily supply client’s consumption. Only surplus of produced energy will be delivered to distribution network. If one can learn client’s behavior and combine it with PV system production data, it is possible to manipulate PV system power. If so, the client will be able to produce more energy daily than it was supposed to, but also will not increase the assigned maximum power limit. In this research a single instance of calculation for PV system power increase is provided using measured data of PV system production and energy counter on distribution network. Main goal is to get as much energy possible from client but keep everything from escalating regarding contract with electrical energy distributer and supplier. Obviously, the worst-case scenario would be on a day with the highest energy production while maintaining average consumption characteristics.

Authors

Institutions

Publication Details

Journal
Et2er.
Published
2024-12-19
DOI
https://doi.org/10.70077/et2er.6.2.8
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design of PV system peak power adjustment based on measured data

Ivan Petrović, Enes Ciriković, Danijel Koprivanac, Mario Vražić
Et2er.
Power Systems and Renewable Energy
article

Design of PV system peak power adjustment based on measured data

Ivan Petrović, Enes Ciriković, Danijel Koprivanac, Mario Vražić
article en

Abstract

The maximum power production limit is assigned to licensed clients with photovoltaic (PV) system. For safety reasons this limit is mainly determined to be equal to the PV system power output limit. The limit does not have to be the same as installed PV system power. Maximum power of electric energy delivered to distribution network will depend on client’s consumption behavior, as PV system production will primarily supply client’s consumption. Only surplus of produced energy will be delivered to distribution network. If one can learn client’s behavior and combine it with PV system production data, it is possible to manipulate PV system power. If so, the client will be able to produce more energy daily than it was supposed to, but also will not increase the assigned maximum power limit. In this research a single instance of calculation for PV system power increase is provided using measured data of PV system production and energy counter on distribution network. Main goal is to get as much energy possible from client but keep everything from escalating regarding contract with electrical energy distributer and supplier. Obviously, the worst-case scenario would be on a day with the highest energy production while maintaining average consumption characteristics.

Et2er.Vol. 6(2)
University of Zagreb (HR), College for Management in Tourism and Informatics in Virovitica (HR)
Openalex Percentile: Top 76%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.