Takt complementing Last Planner® System on residential construction projects.

Ireland is experiencing a national housing crisis, and this is replicated across many developed economies. This challenges governments and housebuilders to increase production whilst balancing challenging human resource and supply chain constraints. Lean construction methodologies have enhanced project delivery in other sectors of the industry. This study evaluates the outcomes of Last Planner System and Takt planning implementation on two residential projects. The study adopted a mixed methods approach utilising case study design and data collected from a literature review, site observation diary, site documentation analysis, and semi-structured interviews. Findings demonstrate schedule reduction opportunities through higher and more consistent PPC, reduction of cycle times, and enhanced adherence to start and finish dates. The study proposes a more holistic focus is needed on productivity improvement initiatives on the entire project scope as opposed to singular exercises on aspects like internal finishes alone. Increased inter-contractor communication and engagement led to a positive working environment with greater focus on the softer aspects of collaborative working. This study posits the discipline, detail, and diligence of Takt complements LPS to deliver an enhanced production-system that betters traditional schedule milestones in residential project delivery.

Authors

Publication Details

Journal
Construction Economics and Building
Published
2024-10-01
DOI
https://doi.org/10.5130/ajceb.v24i4/5.8846
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Takt complementing Last Planner® System on residential construction projects.

William Power
Construction Economics and Building
BIM and Construction Integration
article

Takt complementing Last Planner® System on residential construction projects.

William Power
article en

Abstract

Ireland is experiencing a national housing crisis, and this is replicated across many developed economies. This challenges governments and housebuilders to increase production whilst balancing challenging human resource and supply chain constraints. Lean construction methodologies have enhanced project delivery in other sectors of the industry. This study evaluates the outcomes of Last Planner System and Takt planning implementation on two residential projects. The study adopted a mixed methods approach utilising case study design and data collected from a literature review, site observation diary, site documentation analysis, and semi-structured interviews. Findings demonstrate schedule reduction opportunities through higher and more consistent PPC, reduction of cycle times, and enhanced adherence to start and finish dates. The study proposes a more holistic focus is needed on productivity improvement initiatives on the entire project scope as opposed to singular exercises on aspects like internal finishes alone. Increased inter-contractor communication and engagement led to a positive working environment with greater focus on the softer aspects of collaborative working. This study posits the discipline, detail, and diligence of Takt complements LPS to deliver an enhanced production-system that betters traditional schedule milestones in residential project delivery.

Construction Economics and BuildingVol. 24(4/5)
Decent work and economic growth
Openalex Percentile: Top 75%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Takt complementing Last Planner® System on residential construction projects. — William Power · Construction Economics and Building (2024) | TGRS Research Map | TGRS