How to find the optimal time for contractor involvement in infrastructure projects?

Purpose There is a general assumption that the early involvement of the contractor contributes to value in construction projects. While early contractor involvement (ECI) may improve the value, some studies identify challenges with ECI. This paper aims to identify the main parameters that can be used to determine the optimal time for contractor involvement and examine how these parameters can be used by clients to develop a systematic method for finding the optimal timing for involvement. Design/methodology/approach Literature studies, interviews, workshops and focus-group meetings identified six main parameters essential for developing a method to determine the ideal timing for ECI. Findings The six identified parameters are activity, complexity, criticality, technical competencies, relational competencies and uncertainty. These parameters can be used to identify the gap between the available competency in the project team and the needed competency to perform an activity. Originality/value Although clients have ways to identify the optimal time for contractor involvement, these ways are mainly subjective and based on in-house practice. By evaluating these six parameters, a more systematic and objective method for early involvement can be developed.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-12-18
DOI
https://doi.org/10.1108/ecam-05-2023-0508
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

How to find the optimal time for contractor involvement in infrastructure projects?

Paulos Abebe Wondimu, Ola Lædre‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌, Nadina Memić, Ole Jonny Klakegg et al.
Engineering Construction & Architectural Management
Construction Project Management and Performance
article

How to find the optimal time for contractor involvement in infrastructure projects?

Paulos Abebe Wondimu, Ola Lædre‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌, Nadina Memić, Ole Jonny Klakegg, Tausif Ahmed Ishtiaque, Allen Tadayon
article en

Abstract

Purpose There is a general assumption that the early involvement of the contractor contributes to value in construction projects. While early contractor involvement (ECI) may improve the value, some studies identify challenges with ECI. This paper aims to identify the main parameters that can be used to determine the optimal time for contractor involvement and examine how these parameters can be used by clients to develop a systematic method for finding the optimal timing for involvement. Design/methodology/approach Literature studies, interviews, workshops and focus-group meetings identified six main parameters essential for developing a method to determine the ideal timing for ECI. Findings The six identified parameters are activity, complexity, criticality, technical competencies, relational competencies and uncertainty. These parameters can be used to identify the gap between the available competency in the project team and the needed competency to perform an activity. Originality/value Although clients have ways to identify the optimal time for contractor involvement, these ways are mainly subjective and based on in-house practice. By evaluating these six parameters, a more systematic and objective method for early involvement can be developed.

Engineering Construction & Architectural ManagementVol. 32(11)
Norwegian Public Roads Administration (NO), OsloMet – Oslo Metropolitan University (NO), Norwegian University of Science and Technology (NO), Metropolitan University (BD), Universidad Metropolitana (PR)
Industry, innovation and infrastructure
Openalex Percentile: Top 71%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.