Research on medium and long term optimal operation of cascade hydropower stations on Tibet's Lhasa River-Yarlung Zangbo River

In order to optimize the medium and long term joint operation of cascade hydropower stations in Tibet's Lhasa River-Yarlung Zangbo River basin, this study takes year as the cycle, month and ten days as the dispatching period, and constructs the medium and long term maximum annual power generation model of Pangduo, Zhikong, Dagu, Zangmu and Jiacha cascade hydropower stations, and uses the successive approximation dynamic programming (DPSA) algorithm to solve the problem. By determining the boundary conditions such as the comprehensive output coefficient, the highest and lowest water level, the maximum and minimum output, the joint operation calculation is carried out according to 27 typical year combinations: the operation mode of Zhikong station under different typical year types and the kinetic energy index of the cascade joint operation of each hydropower station are studied. The dispatching process of each hydropower station under the maximum power generation mode is studied, and the operation proposal of the hydropower station with Pangduo and Zhikong are given.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2024-12-01
DOI
https://doi.org/10.1049/icp.2024.4116
Citations
1
Primary Topic
Water Resources and Management
Type
article
Field-Weighted Citation Impact
0.46
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on medium and long term optimal operation of cascade hydropower stations on Tibet's Lhasa River-Yarlung Zangbo River

Huangheng Tao, Lianjie Li, C.D. Chen, Yanli Chen et al.
1 citations
IET conference proceedings.
Water Resources and Management
0.46
article

Research on medium and long term optimal operation of cascade hydropower stations on Tibet's Lhasa River-Yarlung Zangbo River

Huangheng Tao, Lianjie Li, C.D. Chen, Yanli Chen, Jiang Guo, Wei Liu, Wei Zong
article en
1 citations

Abstract

In order to optimize the medium and long term joint operation of cascade hydropower stations in Tibet's Lhasa River-Yarlung Zangbo River basin, this study takes year as the cycle, month and ten days as the dispatching period, and constructs the medium and long term maximum annual power generation model of Pangduo, Zhikong, Dagu, Zangmu and Jiacha cascade hydropower stations, and uses the successive approximation dynamic programming (DPSA) algorithm to solve the problem. By determining the boundary conditions such as the comprehensive output coefficient, the highest and lowest water level, the maximum and minimum output, the joint operation calculation is carried out according to 27 typical year combinations: the operation mode of Zhikong station under different typical year types and the kinetic energy index of the cascade joint operation of each hydropower station are studied. The dispatching process of each hydropower station under the maximum power generation mode is studied, and the operation proposal of the hydropower station with Pangduo and Zhikong are given.

IET conference proceedings.Vol. 2024(20)
Wuhan University (CN), NARI Group (China) (CN), Yalong Hydro (China) (CN)
Openalex Percentile: Top 27%
Water Resources and Management
0.46
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.