Management of Material Stocks for Preventive Maintenance of Electrical Equipment

The report presents two models for determining the optimal number of spare parts. In the first model, the task is to determine the volume of spare parts for a given period under the condition of sufficiency, i.e., absence of downtime due to lack of spare parts. The second model makes it possible to determine the optimal number of spare parts to be in stock at the start of preventive maintenance, so that the total costs during the cycle are minimal.

Authors

Institutions

Publication Details

Published
2024-09-19
DOI
https://doi.org/10.1109/bulef63204.2024.10794933
Citations
1
Primary Topic
Engineering Diagnostics and Reliability
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Management of Material Stocks for Preventive Maintenance of Electrical Equipment

Svetlana Tzvetkova, Yavor Lozanov, Angel Petleshkov
1 citations
Engineering Diagnostics and Reliability
0.27
article

Management of Material Stocks for Preventive Maintenance of Electrical Equipment

Svetlana Tzvetkova, Yavor Lozanov, Angel Petleshkov
article en
1 citations

Abstract

The report presents two models for determining the optimal number of spare parts. In the first model, the task is to determine the volume of spare parts for a given period under the condition of sufficiency, i.e., absence of downtime due to lack of spare parts. The second model makes it possible to determine the optimal number of spare parts to be in stock at the start of preventive maintenance, so that the total costs during the cycle are minimal.

Technical University of Sofia (BG)
Openalex Percentile: Top 47%
Engineering Diagnostics and Reliability
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Management of Material Stocks for Preventive Maintenance of Electrical Equipment — Svetlana Tzvetkova, Yavor Lozanov, et al. · (2024) | TGRS Research Map | TGRS