Analysis of the Effect of the Use of Mobile Bulb-Turbines in the Hydropower Utilization of the Water Potential of the Danube River: Technical Characteristics of the Generation Unit
The paper explores the potential impacts of incorporating mobile bull-turbines into the design of two hydraulic engineering projects on the Danube River: the Nikopol- Turnu Magurele complex (at river kilometer 580+650) and the Sillstra-Calarasl complex (at river kilometer 384+500). It provides a detailed technical overview of the generation unit's features and examines how these turbines might influence the design, efficiency, and functionality of the projects.
Authors
- Eng. Plamen Dilkov
Publication Details
- Published
- 2024-09-19
- DOI
- https://doi.org/10.1109/bulef63204.2024.10794954
- Primary Topic
- Advanced Power Generation Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00