A BIM-based intelligent approach to rebar layout optimization for reinforced concrete columns

This study aims to address inefficiencies and errors in current manual rebar practices within the architecture, engineering, and construction (AEC) industry, which contribute to significant rebar waste. The Design-Bid-Build (DBB) project delivery method further exacerbates these issues by hindering effective stakeholder collaboration. By contrast, integrated project delivery and building information modeling (BIM) have shown potential for enhanced coordination and waste reduction. Yet, the continued reliance on manual rebar modeling in BIM highlights a pressing need for intelligent automation. This study presents a novel BIM-based algorithm that leverages Dynamo for rebar layout optimization and Navisworks for automatic clash detection, integrating rebar optimization prior to BIM model creation to minimize data exchange errors. The methodology was validated on a continuous-column rebar arrangement, supported by a standardized rebar summary sheet to streamline the optimization and clash-detection process. Key findings indicate that this approach significantly reduces working hours while achieving high modeling accuracy compared to traditional manual methods. These results highlight the potential of the proposed framework to transform rebar layout practices, enabling smart, efficient, and sustainable construction through automated clash-free rebar layout generation. Schematic representation of a BIM-based intelligent approach to rebar layout of a reinforced concrete column. • Design-Bid-Build limits collaboration, increasing rebar waste in construction. • While IPD-BIM improves workflows, manual rebar modeling remains prevalent. • Dynamo and Navisworks optimize rebar layout for continuous column designs. • The rebar summary sheet standardizes and supports the Dynamo script. • Improved model accuracy and reduced working hours highlight efficiency gains.

Authors

Institutions

Publication Details

Journal
Journal of Building Engineering
Published
2024-12-18
DOI
https://doi.org/10.1016/j.jobe.2024.111604
Citations
5
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.33

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A BIM-based intelligent approach to rebar layout optimization for reinforced concrete columns

Daniel Darma Widjaja, Titi Sari Nurul Rachmawati, Sunkuk Kim
5 citations
Journal of Building Engineering
BIM and Construction Integration
1.33
article

A BIM-based intelligent approach to rebar layout optimization for reinforced concrete columns

Daniel Darma Widjaja, Titi Sari Nurul Rachmawati, Sunkuk Kim
article en
5 citations

Abstract

This study aims to address inefficiencies and errors in current manual rebar practices within the architecture, engineering, and construction (AEC) industry, which contribute to significant rebar waste. The Design-Bid-Build (DBB) project delivery method further exacerbates these issues by hindering effective stakeholder collaboration. By contrast, integrated project delivery and building information modeling (BIM) have shown potential for enhanced coordination and waste reduction. Yet, the continued reliance on manual rebar modeling in BIM highlights a pressing need for intelligent automation. This study presents a novel BIM-based algorithm that leverages Dynamo for rebar layout optimization and Navisworks for automatic clash detection, integrating rebar optimization prior to BIM model creation to minimize data exchange errors. The methodology was validated on a continuous-column rebar arrangement, supported by a standardized rebar summary sheet to streamline the optimization and clash-detection process. Key findings indicate that this approach significantly reduces working hours while achieving high modeling accuracy compared to traditional manual methods. These results highlight the potential of the proposed framework to transform rebar layout practices, enabling smart, efficient, and sustainable construction through automated clash-free rebar layout generation. Schematic representation of a BIM-based intelligent approach to rebar layout of a reinforced concrete column. • Design-Bid-Build limits collaboration, increasing rebar waste in construction. • While IPD-BIM improves workflows, manual rebar modeling remains prevalent. • Dynamo and Navisworks optimize rebar layout for continuous column designs. • The rebar summary sheet standardizes and supports the Dynamo script. • Improved model accuracy and reduced working hours highlight efficiency gains.

Journal of Building EngineeringVol. 99
University of Indonesia (ID), Kyung Hee University (KR), Daegu TechnoPark (KR)
Government of the Republic of Kenya, Ministry of Education - Singapore, National Research Foundation of Korea
Sustainable cities and communities
Openalex Percentile: Top 20%
BIM and Construction Integration
1.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.