An Improved Random Forest–Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty

Long-distance tunnel construction involves a sequence of construction operations that are influenced by various uncertain factors. Accurate operation duration prediction is critical to inform long-distance tunnel construction management and decision-making. In this study, a novel operation duration prediction method called random forest improved by whale optimization algorithm (WOA-RF) is proposed by considering geological conditions—the most significant uncertain factor in long-distance tunnel construction. Firstly, a geological uncertainty prediction model was established to estimate probability of geological conditions along the tunnel. Secondly, factors influencing the durations of five key construction operations, i.e., drilling, charge blasting, mucking, supporting steel frame, and shotcrete were analyzed. A prediction model for the concerned operation durations was established using the WOA-RF. Furthermore, considering the uncertainty of tunnel geological conditions, a method for calculating the expected operation duration related to a certain geological condition was proposed. Effectiveness of the proposed WOA-RF model is demonstrated in a case study, showing better performance in terms of average absolute error, root mean square error, and determination coefficient than RF model. The proposed approach can be used to inform the arrival time of the subsequent team in real time during construction, and predict the construction progress to provide a scientific basis for scheduling and timely controlling the long-distance tunnel construction progress under geological uncertainties.

Authors

Institutions

Publication Details

Journal
Journal of Computing in Civil Engineering
Published
2024-12-18
DOI
https://doi.org/10.1061/jccee5.cpeng-6041
Citations
6
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
1.57
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Improved Random Forest–Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty

Donghai Liu, Junjie Chen, Tony Lu, Rui Zhang et al.
6 citations
Journal of Computing in Civil Engineering
Tunneling and Rock Mechanics
1.57
article

An Improved Random Forest–Based Operation Duration Prediction of Long-Distance Tunnel Construction Considering Geological Uncertainty

Donghai Liu, Junjie Chen, Tony Lu, Rui Zhang, X. Tang, Qianxin Dai
article en
6 citations

Abstract

Long-distance tunnel construction involves a sequence of construction operations that are influenced by various uncertain factors. Accurate operation duration prediction is critical to inform long-distance tunnel construction management and decision-making. In this study, a novel operation duration prediction method called random forest improved by whale optimization algorithm (WOA-RF) is proposed by considering geological conditions—the most significant uncertain factor in long-distance tunnel construction. Firstly, a geological uncertainty prediction model was established to estimate probability of geological conditions along the tunnel. Secondly, factors influencing the durations of five key construction operations, i.e., drilling, charge blasting, mucking, supporting steel frame, and shotcrete were analyzed. A prediction model for the concerned operation durations was established using the WOA-RF. Furthermore, considering the uncertainty of tunnel geological conditions, a method for calculating the expected operation duration related to a certain geological condition was proposed. Effectiveness of the proposed WOA-RF model is demonstrated in a case study, showing better performance in terms of average absolute error, root mean square error, and determination coefficient than RF model. The proposed approach can be used to inform the arrival time of the subsequent team in real time during construction, and predict the construction progress to provide a scientific basis for scheduling and timely controlling the long-distance tunnel construction progress under geological uncertainties.

Journal of Computing in Civil EngineeringVol. 39(2)
Tianjin University (CN), Xiamen Institute of Building Research Group (CN)
Openalex Percentile: Top 18%
Tunneling and Rock Mechanics
1.57
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.