Correction to “Development of intelligent traction walking plate for tension overhead construction”
Due to our mistake in writing the paper, we wrote the wrong application time and place in the sixth part of the engineering application in the original paper.Therefore, we would like to change the sentence 'At the same time, the developed intelligent traction plate was applied on October 11, 2020, in the Shandong Heze Yongfeng 220 kV transmission line project, the engineering application situation is shown in Figure 15,' to 'At the same time, the developed intelligent traction plate was applied on 11 October 2023 in a 220 kV transmission line project in China; the engineering application situation is shown in Figure 15.'We apologize for this error.
Publication Details
- Journal
- The Journal of Engineering
- Published
- 2024-12-01
- DOI
- https://doi.org/10.1049/tje2.70041
- Primary Topic
- Industrial Technology and Control Systems
- Type
- article
- Field-Weighted Citation Impact
- 0.00