Onsite performance testing of Archimedes hydropower screw for low head and ultra-low head hydro power project– A case study

Abstract A low head hydro project refers to hydropower sites operating at head less than 40 m and an ultra-low head refers hydropower sites operating at head less than 3 m or water flow greater than 0.5 m/s with a zero head. These hydro sites though ubiquitous, were not developed at the same pace as medium and high head sites. These sites can play a crucial role in the capacity addition of 45 GW per year for net zero by 2050 according to the International Hydropower Association report. With the introduction of Archimedes screw technology, these sites can be developed both technologically and economically. This paper presents a case study on first of its kind performance testing of electro-mechanical equipment at Archimedes screw projects located in the Vadodara Branch Canal of Sardar Sarovar Narmada Nigam Limited Gujarat. The performance testing was conducted on 4.3 m diameter Archimedes screw designed for a rated head of 6.5 m, and a rated discharge of 7.45 m 3 /s. The project is designed to deliver 410 kW turbine output, with an inclination angle of 26 degrees from horizontal. The onsite performance study carried out indicates that the achieved Archimedes screw efficiency is 86.6 %.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2024-11-01
DOI
https://doi.org/10.1088/1755-1315/1411/1/012070
Citations
1
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
1.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Onsite performance testing of Archimedes hydropower screw for low head and ultra-low head hydro power project– A case study

Christopher Stephen, Manish Kr. Singh, Durgesh K. Tiwari, Deepak S. Pillai
1 citations
IOP Conference Series Earth and Environmental Science
Cavitation Phenomena in Pumps
1.27
article

Onsite performance testing of Archimedes hydropower screw for low head and ultra-low head hydro power project– A case study

Christopher Stephen, Manish Kr. Singh, Durgesh K. Tiwari, Deepak S. Pillai
article en
1 citations

Abstract

Abstract A low head hydro project refers to hydropower sites operating at head less than 40 m and an ultra-low head refers hydropower sites operating at head less than 3 m or water flow greater than 0.5 m/s with a zero head. These hydro sites though ubiquitous, were not developed at the same pace as medium and high head sites. These sites can play a crucial role in the capacity addition of 45 GW per year for net zero by 2050 according to the International Hydropower Association report. With the introduction of Archimedes screw technology, these sites can be developed both technologically and economically. This paper presents a case study on first of its kind performance testing of electro-mechanical equipment at Archimedes screw projects located in the Vadodara Branch Canal of Sardar Sarovar Narmada Nigam Limited Gujarat. The performance testing was conducted on 4.3 m diameter Archimedes screw designed for a rated head of 6.5 m, and a rated discharge of 7.45 m 3 /s. The project is designed to deliver 410 kW turbine output, with an inclination angle of 26 degrees from horizontal. The onsite performance study carried out indicates that the achieved Archimedes screw efficiency is 86.6 %.

IOP Conference Series Earth and Environmental ScienceVol. 1411(1)
Vel Tech Rangarajan Dr. Sagunthala R&D Institute of Science and Technology (IN), Devi Ahilya Vishwavidyalaya (IN), Renewable Energy Systems (United States) (US)
Openalex Percentile: Top 20%
Cavitation Phenomena in Pumps
1.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Onsite performance testing of Archimedes hydropower screw for low head and ultra-low head hydro power project– A case study — Christopher Stephen, Manish Kr. Singh, et al. · IOP Conference Series Earth and Environmental Science (2024) | TGRS Research Map | TGRS