Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty

Abstract Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.

Authors

Institutions

Publication Details

Journal
Engineering Reports
Published
2024-09-22
DOI
https://doi.org/10.1002/eng2.13005
Citations
3
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.63

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty

Y. Liu, Zhang Xiao-hui
3 citations
Engineering Reports
Smart Grid Energy Management
0.63
article

Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty

Y. Liu, Zhang Xiao-hui
article en
3 citations

Abstract

Abstract Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.

Engineering ReportsVol. 6(12)
Shenyang Institute of Engineering (CN)
Department of Education of Liaoning Province
Openalex Percentile: Top 30%
Smart Grid Energy Management
0.63
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty — Y. Liu, Zhang Xiao-hui · Engineering Reports (2024) | TGRS Research Map | TGRS