Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times

In practice, activities of the construction multiproject use limited resources in different locations, which requires resources to be transferred frequently between projects or activities. In this study, we simultaneously consider the stochastic resource transfer times and the dynamic arrival of new projects during the multiproject execution and propose the resource-constrained dynamic multiproject scheduling problem with stochastic transfer times (RCDMPSP-STT). Since priority rule (PR)-based heuristic methods can efficiently solve project scheduling problems through real-time decision making in uncertain environments, we evaluate the performance of 72 PR-based heuristic methods based on six objectives from the project, multiproject, and resource perspectives. Each PR-based heuristic method consists of an activity priority rule (APR) and a transfer priority rule (TPR) to determine the sequence of activities and resource transfer. Moreover, based on the resource transfer information, we design eight new APRs. In addition, a hybrid PR-based heuristic method is proposed to select different PR-based heuristic methods for multiproject scheduling based on the arrival time of the new projects. Extensive numerical experiments show that the newly designed resource transfer information-based APRs and composite APRs perform better on the robustness and makespan objectives, respectively, with an improvement of 30.63% and 22.24% compared with the classical APRs. Furthermore, under different objectives and perspectives, better-performing PR-based heuristic methods are recommended for the project and multiproject managers.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-12-13
DOI
https://doi.org/10.1061/jcemd4.coeng-15342
Citations
1
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times

Erik Demeulemeester, Lubo Li, Haohua Zhang, Jingwen Zhang et al.
1 citations
Journal of Construction Engineering and Management
Resource-Constrained Project Scheduling
0.49
article

Heuristic Methods for Dynamic Multiproject Scheduling Problems with Stochastic Transfer Times

Erik Demeulemeester, Lubo Li, Haohua Zhang, Jingwen Zhang, Sijun Bai
article en
1 citations

Abstract

In practice, activities of the construction multiproject use limited resources in different locations, which requires resources to be transferred frequently between projects or activities. In this study, we simultaneously consider the stochastic resource transfer times and the dynamic arrival of new projects during the multiproject execution and propose the resource-constrained dynamic multiproject scheduling problem with stochastic transfer times (RCDMPSP-STT). Since priority rule (PR)-based heuristic methods can efficiently solve project scheduling problems through real-time decision making in uncertain environments, we evaluate the performance of 72 PR-based heuristic methods based on six objectives from the project, multiproject, and resource perspectives. Each PR-based heuristic method consists of an activity priority rule (APR) and a transfer priority rule (TPR) to determine the sequence of activities and resource transfer. Moreover, based on the resource transfer information, we design eight new APRs. In addition, a hybrid PR-based heuristic method is proposed to select different PR-based heuristic methods for multiproject scheduling based on the arrival time of the new projects. Extensive numerical experiments show that the newly designed resource transfer information-based APRs and composite APRs perform better on the robustness and makespan objectives, respectively, with an improvement of 30.63% and 22.24% compared with the classical APRs. Furthermore, under different objectives and perspectives, better-performing PR-based heuristic methods are recommended for the project and multiproject managers.

Journal of Construction Engineering and ManagementVol. 151(2)
Northwestern Polytechnical University (CN), North China University of Water Resources and Electric Power (CN), KU Leuven (BE)
Openalex Percentile: Top 28%
Resource-Constrained Project Scheduling
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.