Reactive power redispatch at the TSO-DSO interface: analysis of the challenges and differences for processual integration

Abstract The increasing challenge of maintaining voltage due to reduced reliable reactive power potentials in the transmission grid requires a fast and economically optimal consideration of reactive power in the congestion management processes of transmission system operators. Established processes such as the German Redispatch 2.0 process adjust the dispatch of plants to avoid congestion but do not make use of available reactive power potentials to avoid voltage-related congestion. This work evaluates the suitability of existing processes for application to reactive power. Using a realistic distribution grid, the procedural Redispatch 2.0 specifications for clustering reactive power are applied. It can be shown that the determination of reliable reactive power capability is associated with more dependencies and influencing factors than with active power. This leads to the need for a separate cluster concept and, due to the operating point dependency, for a procedure coordinated with the grid situation.

Authors

Institutions

Publication Details

Journal
e+i Elektrotechnik und Informationstechnik
Published
2024-12-01
DOI
https://doi.org/10.1007/s00502-024-01294-x
Citations
1
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.36

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reactive power redispatch at the TSO-DSO interface: analysis of the challenges and differences for processual integration

Steffen Schlegel, Dirk Westermann, Nadja Isabelle Belz, Jannes Grünberg
1 citations
e+i Elektrotechnik und Informationstechnik
Power System Reliability and Maintenance
0.36
article

Reactive power redispatch at the TSO-DSO interface: analysis of the challenges and differences for processual integration

Steffen Schlegel, Dirk Westermann, Nadja Isabelle Belz, Jannes Grünberg
article en
1 citations

Abstract

Abstract The increasing challenge of maintaining voltage due to reduced reliable reactive power potentials in the transmission grid requires a fast and economically optimal consideration of reactive power in the congestion management processes of transmission system operators. Established processes such as the German Redispatch 2.0 process adjust the dispatch of plants to avoid congestion but do not make use of available reactive power potentials to avoid voltage-related congestion. This work evaluates the suitability of existing processes for application to reactive power. Using a realistic distribution grid, the procedural Redispatch 2.0 specifications for clustering reactive power are applied. It can be shown that the determination of reliable reactive power capability is associated with more dependencies and influencing factors than with active power. This leads to the need for a separate cluster concept and, due to the operating point dependency, for a procedure coordinated with the grid situation.

e+i Elektrotechnik und InformationstechnikVol. 141(7-8)
Technische Universität Ilmenau (DE)
Technische Universität Ilmenau
Affordable and clean energy
Openalex Percentile: Top 37%
Power System Reliability and Maintenance
0.36
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.