Rancangan Desain Sump pada Pit Jamrud Kabupaten Konawe Utara Sulawesi Tenggara

A sump is a drainage facility located at the bottom of the pit. The sump design must be appropriate so that runoff water flowing on the surface can be maximally accommodated. This can overcome stagnant water on the ground and avoid disruptions to mining productivity. Jamrud Pit has an area of 4.14 ha and is mined using the open pit method. The purpose of this research is to calculate and analyze the water discharge that will enter the sump and design the sump according to the volume of runoff water entering the sump. Based on the research results, there are two sumps placed at the bottom of the pit according to the pit cross-section model. Sump 1 has a runoff water volume of 2,914.24 m3, so it is designed with a top area of 27 x 27 m2 and a base area of 21 x 21 m2 with a depth of 5 m and can accommodate a water volume of 2,997.6 m3. While in sump 2, the volume of incoming runoff water is 579.85 m3, so it is designed with a top area of 14 x 14 m2 and a base area of 8 x 8 m2 with a depth of 5 m so that it can accommodate a water volume of 663.18 m3. The sump cross-section model is adjusted to the characteristics of the soil layer, namely the trapezoidal model.

Authors

Institutions

Publication Details

Journal
OPHIOLITE Jurnal Geologi Terapan
Published
2024-12-11
DOI
https://doi.org/10.56099/ophi.v6i2.p64-71
Primary Topic
Mine drainage and remediation techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rancangan Desain Sump pada Pit Jamrud Kabupaten Konawe Utara Sulawesi Tenggara

Deniyatno Deniyatno, Erwin Anshari, Ika Sartika Ambarsari, Arif Setiawan
16 links
OPHIOLITE Jurnal Geologi Terapan
Mine drainage and remediation techniques
article

Rancangan Desain Sump pada Pit Jamrud Kabupaten Konawe Utara Sulawesi Tenggara

Deniyatno Deniyatno, Erwin Anshari, Ika Sartika Ambarsari, Arif Setiawan
article en

Abstract

A sump is a drainage facility located at the bottom of the pit. The sump design must be appropriate so that runoff water flowing on the surface can be maximally accommodated. This can overcome stagnant water on the ground and avoid disruptions to mining productivity. Jamrud Pit has an area of 4.14 ha and is mined using the open pit method. The purpose of this research is to calculate and analyze the water discharge that will enter the sump and design the sump according to the volume of runoff water entering the sump. Based on the research results, there are two sumps placed at the bottom of the pit according to the pit cross-section model. Sump 1 has a runoff water volume of 2,914.24 m3, so it is designed with a top area of 27 x 27 m2 and a base area of 21 x 21 m2 with a depth of 5 m and can accommodate a water volume of 2,997.6 m3. While in sump 2, the volume of incoming runoff water is 579.85 m3, so it is designed with a top area of 14 x 14 m2 and a base area of 8 x 8 m2 with a depth of 5 m so that it can accommodate a water volume of 663.18 m3. The sump cross-section model is adjusted to the characteristics of the soil layer, namely the trapezoidal model.

OPHIOLITE Jurnal Geologi TerapanVol. 6(2)
Universitas Halu Oleo (ID)
Openalex Percentile: Top 82%
Mine drainage and remediation techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.