Designing, building and operating an up-scaled methane producing bioelectrochemical system for power-to-methane

A 17 L scale up methane producing bioelectrochemical system (BES) for power-to-gas application was built taking into account: (1) use of granular activated carbon as cathode material to provide a large surface area for the reaction to take place; (2) a commercially available tubular membrane separating the anaerobic cathodic reaction from the anodic oxygen production; (3) an hexagonal prism design that can be further up-scaled in modules, specially avoiding the hurdle of producing electrodes in non-commercially available sizes. The BES was operated for 470 days with step wise increase in applied current density between −6 and −125 A m −3 BES , with resulting methane production rates between 10 NL m −3 BES d −1 and 280 NL m −3 BES d −1 and faradaic efficiency ranging between 80% and 100%. A stable performance was observed after a start-up period of around 70 days. Furthermore, changes in the electrolyte composition and anode dimensions were made in order to decrease losses associated to the electrolyte and anode reaction, respectively. The distribution of the voltage losses is assessed in this paper and for the majority of the experimental time the energy efficiency ranged around 40%, specifically when operating with an electrolyte with / carbonate/bicarbonate concentrations of 0.2 M, 0.4 M and 0.6 M and with an anode surface area equal to or larger than 0.02 m 2 . Besides the BES itself, the reactor line-up included a bubble column, an oxygen stripping unit and an interchange vessel, all of which essential for its operation. • A 17 L methane producing BES with GAC as cathode material was built. • Stable performance was observed for 400 days with an energy efficiency of around 40%. • Methane production rates up to 280 NL m −3 BES d −1 were achieved.

Authors

Institutions

Publication Details

Journal
Journal of Power Sources
Published
2024-12-12
DOI
https://doi.org/10.1016/j.jpowsour.2024.236010
Citations
4
Primary Topic
Microbial Fuel Cells and Bioremediation
Type
article
Field-Weighted Citation Impact
0.82

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing, building and operating an up-scaled methane producing bioelectrochemical system for power-to-methane

John Steller, Micaela Brandão Lavender, Rieks de Rink, Annemiek ter Heijne et al.
4 citations
Journal of Power Sources
Microbial Fuel Cells and Bioremediation
0.82
article

Designing, building and operating an up-scaled methane producing bioelectrochemical system for power-to-methane

John Steller, Micaela Brandão Lavender, Rieks de Rink, Annemiek ter Heijne, Dandan Liu, Shiba Tofik
article en
4 citations

Abstract

A 17 L scale up methane producing bioelectrochemical system (BES) for power-to-gas application was built taking into account: (1) use of granular activated carbon as cathode material to provide a large surface area for the reaction to take place; (2) a commercially available tubular membrane separating the anaerobic cathodic reaction from the anodic oxygen production; (3) an hexagonal prism design that can be further up-scaled in modules, specially avoiding the hurdle of producing electrodes in non-commercially available sizes. The BES was operated for 470 days with step wise increase in applied current density between −6 and −125 A m −3 BES , with resulting methane production rates between 10 NL m −3 BES d −1 and 280 NL m −3 BES d −1 and faradaic efficiency ranging between 80% and 100%. A stable performance was observed after a start-up period of around 70 days. Furthermore, changes in the electrolyte composition and anode dimensions were made in order to decrease losses associated to the electrolyte and anode reaction, respectively. The distribution of the voltage losses is assessed in this paper and for the majority of the experimental time the energy efficiency ranged around 40%, specifically when operating with an electrolyte with / carbonate/bicarbonate concentrations of 0.2 M, 0.4 M and 0.6 M and with an anode surface area equal to or larger than 0.02 m 2 . Besides the BES itself, the reactor line-up included a bubble column, an oxygen stripping unit and an interchange vessel, all of which essential for its operation. • A 17 L methane producing BES with GAC as cathode material was built. • Stable performance was observed for 400 days with an energy efficiency of around 40%. • Methane production rates up to 280 NL m −3 BES d −1 were achieved.

Journal of Power SourcesVol. 629
Shell (Netherlands) (NL), Wageningen University & Research (NL)
Shell, Shell Global Solutions International
Openalex Percentile: Top 29%
Microbial Fuel Cells and Bioremediation
0.82
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.