Investigation on airplane propulsion system's whole engine test plan

Engine tests carried out by propulsion designers include indoor tests, outdoor tests and flight tests. Meanwhile, test plan made by aircraft designer has system-level cross-linking laboratory tests, onboard function checking tests, ground tests and flight tests. Reasonable test plan should start from product requirements, complete verification work plan based on requirements, and out-put a list of test subjects for the whole engine. Functional and performance tests are applied first and then life and reliability related tests; also principles of lower risk test first and then higher risk one are followed. To improve test organization efficiency, the division of engines and modules can be carried out based on the test requirements of external conditions and configurations etc, and finally form the whole engine test plan during the whole product lifespan. Besides the product design, this plan is able to effectively support one engine test strategy, test bed resource requirement analysis, and other important technical plan during the development process, such as the whole engine weight reduction work plan and rig verification work plan.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2024-12-01
DOI
https://doi.org/10.1049/icp.2024.3936
Primary Topic
Engineering Applied Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigation on airplane propulsion system's whole engine test plan

Kang Cai, Xiaopei Li, Yi Qiu, Hai Zhang et al.
IET conference proceedings.
Engineering Applied Research
article

Investigation on airplane propulsion system's whole engine test plan

Kang Cai, Xiaopei Li, Yi Qiu, Hai Zhang, Wei Zou
article en

Abstract

Engine tests carried out by propulsion designers include indoor tests, outdoor tests and flight tests. Meanwhile, test plan made by aircraft designer has system-level cross-linking laboratory tests, onboard function checking tests, ground tests and flight tests. Reasonable test plan should start from product requirements, complete verification work plan based on requirements, and out-put a list of test subjects for the whole engine. Functional and performance tests are applied first and then life and reliability related tests; also principles of lower risk test first and then higher risk one are followed. To improve test organization efficiency, the division of engines and modules can be carried out based on the test requirements of external conditions and configurations etc, and finally form the whole engine test plan during the whole product lifespan. Besides the product design, this plan is able to effectively support one engine test strategy, test bed resource requirement analysis, and other important technical plan during the development process, such as the whole engine weight reduction work plan and rig verification work plan.

IET conference proceedings.Vol. 2024(17)
Harbin Engineering University (CN)
Openalex Percentile: Top 74%
Engineering Applied Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Investigation on airplane propulsion system's whole engine test plan — Kang Cai, Xiaopei Li, et al. · IET conference proceedings. (2024) | TGRS Research Map | TGRS