Workplace health and safety performance at the client-contractor interface: Measurement, management and behaviour

• We draw on theoretical concepts from the performance measurement and management (PMM) literature. • We explore different PMM regimes that clients utilise to control contractors’ health and safety performance. • Using case studies, we analyse the impact of different PMM regimes on contractors’ health and safety-related behaviour. • The findings suggest that PMM regimes need to be carefully designed to suit project context and avoid undesirable behaviours. As the initiators of construction projects, clients have the ability to influence work health and safety (WHS) in the projects they procure. One of the ways they seek to do this is through the implementation of measurement regimes to collect data that they then utilise to manage the WHS performance of the contractors they engage to deliver projects. However, the validity of widely utilised WHS performance indicators has been questioned and the effectiveness of measurement and management regimes in influencing WHS performance across the client-contractor boundary is not well understood. There is therefore a need to better understand the characteristics of effective measurement and management activities as implemented by construction clients to influence contractors’ WHS performance. Qualitative interviews were conducted with client and contractor representatives engaged in the delivery of large-scale infrastructure construction projects. It was observed that clients implement performance measurement and management (PMM) approaches in relation to WHS. These were grouped into ideal types, i.e. regimes reliant on autocratic, bureaucratic or collaborative forms of control. It was observed that autocratic and bureaucratic PMM regimes produced counterproductive behaviours, including manipulation of information, the promulgation of safety ‘clutter,’ poor quality client-contractor relationships and low levels of trust. In contrast, collaborative regimes produced higher levels of trust, open and honest reporting and collaborative problem-solving in relation to WHS. The findings suggest that PMM regimes should be carefully designed and implemented to ensure that they are effective.

Authors

Institutions

Publication Details

Journal
Safety Science
Published
2024-12-12
DOI
https://doi.org/10.1016/j.ssci.2024.106753
Citations
8
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
3.60
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Workplace health and safety performance at the client-contractor interface: Measurement, management and behaviour

Payam Pirzadeh, Helen Clare Lingard
8 citations
Safety Science
Occupational Health and Safety Research
3.60
article

Workplace health and safety performance at the client-contractor interface: Measurement, management and behaviour

Payam Pirzadeh, Helen Clare Lingard
article en
8 citations

Abstract

• We draw on theoretical concepts from the performance measurement and management (PMM) literature. • We explore different PMM regimes that clients utilise to control contractors’ health and safety performance. • Using case studies, we analyse the impact of different PMM regimes on contractors’ health and safety-related behaviour. • The findings suggest that PMM regimes need to be carefully designed to suit project context and avoid undesirable behaviours. As the initiators of construction projects, clients have the ability to influence work health and safety (WHS) in the projects they procure. One of the ways they seek to do this is through the implementation of measurement regimes to collect data that they then utilise to manage the WHS performance of the contractors they engage to deliver projects. However, the validity of widely utilised WHS performance indicators has been questioned and the effectiveness of measurement and management regimes in influencing WHS performance across the client-contractor boundary is not well understood. There is therefore a need to better understand the characteristics of effective measurement and management activities as implemented by construction clients to influence contractors’ WHS performance. Qualitative interviews were conducted with client and contractor representatives engaged in the delivery of large-scale infrastructure construction projects. It was observed that clients implement performance measurement and management (PMM) approaches in relation to WHS. These were grouped into ideal types, i.e. regimes reliant on autocratic, bureaucratic or collaborative forms of control. It was observed that autocratic and bureaucratic PMM regimes produced counterproductive behaviours, including manipulation of information, the promulgation of safety ‘clutter,’ poor quality client-contractor relationships and low levels of trust. In contrast, collaborative regimes produced higher levels of trust, open and honest reporting and collaborative problem-solving in relation to WHS. The findings suggest that PMM regimes should be carefully designed and implemented to ensure that they are effective.

Safety ScienceVol. 184
RMIT University (AU)
Decent work and economic growth
Openalex Percentile: Top 7%
Occupational Health and Safety Research
3.60
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.