An Actor-Critic Framework Deep Reinforcement Learning Approach to High-speed Train Timetable Rescheduling Problem
High-speed trains are inevitably affected by emergencies in their daily operation, which may cause the trains to fail to run according to the original planned timetable. Therefore, how to adjust the timetable of subsequent trains in emergencies is crucial for railway operations. This paper introduces a deep reinforcement learning algorithm based on an actor-critic network, which minimizes the total delay time by defining the departure order as an action. Numerical experiments are performed on the timetable of Beijing-Shanghai high-speed railway line.
Authors
- Z. F. Tian (ORCID: https://orcid.org/0009-0004-9625-4685)
- Fenghua Zhu (ORCID: https://orcid.org/0000-0003-2886-6968)
- Gang Xiong (ORCID: https://orcid.org/0000-0002-4303-5559)
- Runmei Li (ORCID: https://orcid.org/0000-0002-9034-1399)
Institutions
- Chinese Academy of Sciences (CN)
- Beijing Jiaotong University (CN)
- Shandong Institute of Automation (CN)
Publication Details
- Published
- 2024-10-18
- DOI
- https://doi.org/10.1109/dtpi61353.2024.10778851
- Primary Topic
- Railway Systems and Energy Efficiency
- Type
- article
- Field-Weighted Citation Impact
- 0.00