A Full-Actuated Signal Control Method of Intersection with an Upstream Freeway Off-Ramp Using Pre-Signals

To relieve the traffic congestion caused by the weaving of the traffic streams between the expressway off-ramp and the downstream connected intersection, and at the same time to mitigate the influence of the periodic motor vehicle flow fluctuation, a full-actuated control method for the intersection with an urban expressway off-ramp is proposed based on pre-signals, and a case study of a typical expressway and interface intersection in Zhenjiang City is conducted as the research object. The proposed method, the fixed-period pre-signal control method, and the classical Webster’s timing scheme, as well as the status quo scheme, are subjected to vissim simulation experiments, respectively. The results show that by setting up the full-actuated control scheme based on pre-signals, the vehicle delay and stop times at the intersection are significantly reduced by 24.80% and 30.45%, respectively, and the off-ramp traffic flow is most significantly reduced, which can make the overall operation of the intersection better.

Authors

Institutions

Publication Details

Published
2024-12-11
DOI
https://doi.org/10.1061/9780784485484.144
Primary Topic
Traffic control and management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Full-Actuated Signal Control Method of Intersection with an Upstream Freeway Off-Ramp Using Pre-Signals

Z. C. Feng, Tailong Song, Fenghua Liu, Yifan Chen et al.
Traffic control and management
article

A Full-Actuated Signal Control Method of Intersection with an Upstream Freeway Off-Ramp Using Pre-Signals

Z. C. Feng, Tailong Song, Fenghua Liu, Yifan Chen, Yulong He, Chang Liu
article en

Abstract

To relieve the traffic congestion caused by the weaving of the traffic streams between the expressway off-ramp and the downstream connected intersection, and at the same time to mitigate the influence of the periodic motor vehicle flow fluctuation, a full-actuated control method for the intersection with an urban expressway off-ramp is proposed based on pre-signals, and a case study of a typical expressway and interface intersection in Zhenjiang City is conducted as the research object. The proposed method, the fixed-period pre-signal control method, and the classical Webster’s timing scheme, as well as the status quo scheme, are subjected to vissim simulation experiments, respectively. The results show that by setting up the full-actuated control scheme based on pre-signals, the vehicle delay and stop times at the intersection are significantly reduced by 24.80% and 30.45%, respectively, and the off-ramp traffic flow is most significantly reduced, which can make the overall operation of the intersection better.

Beijing University of Technology (CN), Shandong Transportation Research Institute (CN)
Sustainable cities and communities
Openalex Percentile: Top 73%
Traffic control and management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.