In the electricity market, the interconnection line serves as a key link connecting different power grid regions, and the optimization of its planned allocation is an important link to ensure the safe, economical, and efficient operation of the power system. For the tie line plan allocation problem, this paper proposes a tie line power allocation model based on the day ahead scheduling plan. Through algorithm optimization and reference to historical values, the tie line power allocation is carried out on the basis of meeting the constraints related to clearing in the province, which to a certain extent reduces the problem that the formal link of planning causes the related operating constraints to exceed the limit. The model can also adapt to the changes in grid operating conditions, and dynamically adjust the tie line power allocation. The effectiveness and applicability of the model proposed in this paper are verified through numerical example analysis.

Authors

Institutions

Publication Details

Published
2024-09-27
DOI
https://doi.org/10.1109/icepg63230.2024.10775773
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Tie line power allocation model based on day ahead scheduling

Yixing Chen, Yinguo Yang, Xiangzhong Xie, Guoliang Zhang et al.
Power Systems and Technologies
article

Tie line power allocation model based on day ahead scheduling

Yixing Chen, Yinguo Yang, Xiangzhong Xie, Guoliang Zhang, Rui Yang, Xuchen Tang, Yun Yang
article en

Abstract

In the electricity market, the interconnection line serves as a key link connecting different power grid regions, and the optimization of its planned allocation is an important link to ensure the safe, economical, and efficient operation of the power system. For the tie line plan allocation problem, this paper proposes a tie line power allocation model based on the day ahead scheduling plan. Through algorithm optimization and reference to historical values, the tie line power allocation is carried out on the basis of meeting the constraints related to clearing in the province, which to a certain extent reduces the problem that the formal link of planning causes the related operating constraints to exceed the limit. The model can also adapt to the changes in grid operating conditions, and dynamically adjust the tie line power allocation. The effectiveness and applicability of the model proposed in this paper are verified through numerical example analysis.

China Southern Power Grid (China) (CN)
Openalex Percentile: Top 80%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.