Scheme for automatics transfer switch without splitting new energy source

With the large-scale integration of photovoltaics into the power grid, traditional automatic transfer switch device may fail to operate correctly. Traditional solutions can lead to a decrease in energy utilization efficiency of photovoltaic power plants. Another solution can result in significant impulse current during grid connection in the case of a mismatch between the source and load. This article focuses on the situation where the source is greater than the load, adopting the perturbation and observation (P&O) method to control the duty cycle of the Boost circuit in the photovoltaic array. When the output power approaches the target value after applying a disturbance, continue to apply the disturbance in that direction. Conversely, apply a disturbance in the opposite direction, so that the output power of the photovoltaic array continuously approaches the load power, achieving the goal of minimizing the impulse current during grid connection. Finally, through simulation experiments, compare the impulse current generated during grid connection by adopting the traditional solution and the solution using P&O method after a fault. The simulation results show that the solution using P&O method can reduce the inrush current during grid connection.

Authors

Institutions

Publication Details

Published
2024-09-27
DOI
https://doi.org/10.1109/icepg63230.2024.10776012
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Scheme for automatics transfer switch without splitting new energy source

Wenchang Ma, Rui Huang, Jiayi Li, Junchao Li
Electric Power Systems and Control
article

Scheme for automatics transfer switch without splitting new energy source

Wenchang Ma, Rui Huang, Jiayi Li, Junchao Li
article en

Abstract

With the large-scale integration of photovoltaics into the power grid, traditional automatic transfer switch device may fail to operate correctly. Traditional solutions can lead to a decrease in energy utilization efficiency of photovoltaic power plants. Another solution can result in significant impulse current during grid connection in the case of a mismatch between the source and load. This article focuses on the situation where the source is greater than the load, adopting the perturbation and observation (P&O) method to control the duty cycle of the Boost circuit in the photovoltaic array. When the output power approaches the target value after applying a disturbance, continue to apply the disturbance in that direction. Conversely, apply a disturbance in the opposite direction, so that the output power of the photovoltaic array continuously approaches the load power, achieving the goal of minimizing the impulse current during grid connection. Finally, through simulation experiments, compare the impulse current generated during grid connection by adopting the traditional solution and the solution using P&O method after a fault. The simulation results show that the solution using P&O method can reduce the inrush current during grid connection.

Ningxia Water Conservancy (CN)
Affordable and clean energy
Openalex Percentile: Top 80%
Electric Power Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Scheme for automatics transfer switch without splitting new energy source — Wenchang Ma, Rui Huang, et al. · (2024) | TGRS Research Map | TGRS