Problems of transformability of unfinished construction objects in time. ways to solve

The speed of global changes in the field of economics and politics, in the social and spiritual spheres is the main factor that requires consideration and a special approach not only in judging and stating, but also for anticipating and predicting events. Globalization and possible risks of environmental and economic disasters require prompt solutions. The dynamics of interaction between the developer, the owner and the designer is increasing. The sustainability of an object's development is determined not by its static nature, but by its ability to change parameters, dimensions, functions, etc. In conditions of change, the construction site must also change. Strategic economic development programs aimed at the transition to a closed-loop economy indicate that only 8.6% of the produced product is returned to reuse. This leads to an increase in the workload not only in the field of extraction and processing of resources, but also to an increase in labor costs. The globality of the environmental and economic catastrophe formed in the future requires prompt solutions. Thus, further transformation and adaptation of buildings becomes a mandatory requirement during their design and operation. The lack of the possibility of rapid changes in the life cycle of an object leads to the appearance of abandoned buildings and territories and to an increase in the proportion of unfinished construction. The growing number of such facilities dictates the need, firstly, to create conditions for an operational change of functional purpose, and secondly, to eliminate the imbalance between the growing demand for new areas and the availability of unused ones. One of the ways to solve this problem is the temporary return of unfinished spaces to operation, before the implementation of the main measures for the development of abandoned territories. As a result of the conducted research, three main problems of the appearance of unfinished construction have been identified, firstly, a significant difference between the life cycles of the functions of objects and the needs for these functions, secondly, the mutual influence of the environment on objects and objects on the environment, thirdly, the lack of long-term forecasting. Solutions for each of the identified problems are proposed.

Authors

Institutions

Publication Details

Journal
Building and reconstruction
Published
2024-12-11
DOI
https://doi.org/10.33979/2073-7416-2024-116-6-92-109
Primary Topic
Construction Management and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Problems of transformability of unfinished construction objects in time. ways to solve

O. V. Volichenko, Yu. V. Makunina
Building and reconstruction
Construction Management and Sustainability
article

Problems of transformability of unfinished construction objects in time. ways to solve

O. V. Volichenko, Yu. V. Makunina
article en

Abstract

The speed of global changes in the field of economics and politics, in the social and spiritual spheres is the main factor that requires consideration and a special approach not only in judging and stating, but also for anticipating and predicting events. Globalization and possible risks of environmental and economic disasters require prompt solutions. The dynamics of interaction between the developer, the owner and the designer is increasing. The sustainability of an object's development is determined not by its static nature, but by its ability to change parameters, dimensions, functions, etc. In conditions of change, the construction site must also change. Strategic economic development programs aimed at the transition to a closed-loop economy indicate that only 8.6% of the produced product is returned to reuse. This leads to an increase in the workload not only in the field of extraction and processing of resources, but also to an increase in labor costs. The globality of the environmental and economic catastrophe formed in the future requires prompt solutions. Thus, further transformation and adaptation of buildings becomes a mandatory requirement during their design and operation. The lack of the possibility of rapid changes in the life cycle of an object leads to the appearance of abandoned buildings and territories and to an increase in the proportion of unfinished construction. The growing number of such facilities dictates the need, firstly, to create conditions for an operational change of functional purpose, and secondly, to eliminate the imbalance between the growing demand for new areas and the availability of unused ones. One of the ways to solve this problem is the temporary return of unfinished spaces to operation, before the implementation of the main measures for the development of abandoned territories. As a result of the conducted research, three main problems of the appearance of unfinished construction have been identified, firstly, a significant difference between the life cycles of the functions of objects and the needs for these functions, secondly, the mutual influence of the environment on objects and objects on the environment, thirdly, the lack of long-term forecasting. Solutions for each of the identified problems are proposed.

Building and reconstruction(6)
Moscow State University of Civil Engineering (RU), Institute of Urban and Regional Development (PL)
Responsible consumption and production
Openalex Percentile: Top 76%
Construction Management and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.