Improvement of Concrete Construction Work Performance Through Employment of Lean Logistics Principles

ABSTRACT In logistics systems, the use of methods, approaches, and management procedures with the aim of optimizing all activities has increasingly been promoted. In the case studies, the logistics of the concrete construction work during the implementation of concrete frame structures of residential building projects is analyzed. The examination of the logistics of concrete construction work was carried out using a combination of monitoring, measurement, comparison, and modeling methods. In addition to obtaining real data on the mentioned logistics of concrete construction work, by applying the Just in Time method, as one of the methods of lean logistics, the optimal logistics of ready‐mix concrete transport to construction sites was simulated. In order to reveal the most significant wastages during concrete construction work, the essential parameters of real logistics were compared with the parameters of simulated optimal logistics of ready‐mix concrete transport. The goal of the research is to evaluate the intensity of the application of logistics and its elements in the implementation of construction and to point out the importance of the involvement of lean production methods and thus also lean logistics in the construction industry. Based on this study results from construction projects in Slovakia and also based on the experience of the authors of this work, it can be concluded that the use of logistic management in the supply of the main construction material in the production of monolithic concrete structures is poor, and this causes a lot of unnecessary waste, having an adverse effect not only on the construction time, but also on the management of individual construction resources. It has been proven that investment in planning and management of logistics can lead to increased overall efficiency of the construction and can bring profit in the form of system, synchronization of construction process resources.

Authors

Institutions

Publication Details

Journal
Engineering Reports
Published
2024-12-10
DOI
https://doi.org/10.1002/eng2.13067
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Improvement of Concrete Construction Work Performance Through Employment of Lean Logistics Principles

Mária Kozlovská, Zuzana Struková, Alena Tažiková
1 citations
Engineering Reports
BIM and Construction Integration
0.27
article

Improvement of Concrete Construction Work Performance Through Employment of Lean Logistics Principles

Mária Kozlovská, Zuzana Struková, Alena Tažiková
article en
1 citations

Abstract

ABSTRACT In logistics systems, the use of methods, approaches, and management procedures with the aim of optimizing all activities has increasingly been promoted. In the case studies, the logistics of the concrete construction work during the implementation of concrete frame structures of residential building projects is analyzed. The examination of the logistics of concrete construction work was carried out using a combination of monitoring, measurement, comparison, and modeling methods. In addition to obtaining real data on the mentioned logistics of concrete construction work, by applying the Just in Time method, as one of the methods of lean logistics, the optimal logistics of ready‐mix concrete transport to construction sites was simulated. In order to reveal the most significant wastages during concrete construction work, the essential parameters of real logistics were compared with the parameters of simulated optimal logistics of ready‐mix concrete transport. The goal of the research is to evaluate the intensity of the application of logistics and its elements in the implementation of construction and to point out the importance of the involvement of lean production methods and thus also lean logistics in the construction industry. Based on this study results from construction projects in Slovakia and also based on the experience of the authors of this work, it can be concluded that the use of logistic management in the supply of the main construction material in the production of monolithic concrete structures is poor, and this causes a lot of unnecessary waste, having an adverse effect not only on the construction time, but also on the management of individual construction resources. It has been proven that investment in planning and management of logistics can lead to increased overall efficiency of the construction and can bring profit in the form of system, synchronization of construction process resources.

Engineering ReportsVol. 7(1)
Technical University of Košice (SK)
Vedecká Grantová Agentúra MŠVVaŠ SR a SAV
Openalex Percentile: Top 41%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.