Do actors’ incentives obstruct sector-wide long-term productivity in the design and production of bridges in Sweden?

An increase in productivity is necessary to reduce economic costs in bridge projects. Previous research indicates that construction productivity has decreased since the 1960s. A quantitative study was performed to find out how the incentives of the three major actors (client, contractor, and design engineer) could be obstacles to long-term productivity in the Swedish bridge construction industry. The study was performed as a self-completed questionnaire and received 151 responses. The results show that the contractors’ employees find profit in a single project more important than the company’s profit over time. Thus, the project´s incentives obstruct innovation and standardization, which could benefit future projects and thereby increase long-term productivity and the company’s profit over time. In contrast to contractors, design engineers and clients value company profit more than profit in a single project, and they value the quality of delivered products as the most important factor for increased long-term productivity. First published online 10 December 2024

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering and Management
Published
2024-12-10
DOI
https://doi.org/10.3846/jcem.2024.22720
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Do actors’ incentives obstruct sector-wide long-term productivity in the design and production of bridges in Sweden?

Ola Lædre‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌, Peter Simonsson, Johan Lagerkvist, Rasmus Rempling et al.
Journal of Civil Engineering and Management
Construction Project Management and Performance
article

Do actors’ incentives obstruct sector-wide long-term productivity in the design and production of bridges in Sweden?

Ola Lædre‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌, Peter Simonsson, Johan Lagerkvist, Rasmus Rempling, Petra Bosch‐Sijtsema, Mats Karlsson
article en

Abstract

An increase in productivity is necessary to reduce economic costs in bridge projects. Previous research indicates that construction productivity has decreased since the 1960s. A quantitative study was performed to find out how the incentives of the three major actors (client, contractor, and design engineer) could be obstacles to long-term productivity in the Swedish bridge construction industry. The study was performed as a self-completed questionnaire and received 151 responses. The results show that the contractors’ employees find profit in a single project more important than the company’s profit over time. Thus, the project´s incentives obstruct innovation and standardization, which could benefit future projects and thereby increase long-term productivity and the company’s profit over time. In contrast to contractors, design engineers and clients value company profit more than profit in a single project, and they value the quality of delivered products as the most important factor for increased long-term productivity. First published online 10 December 2024

Journal of Civil Engineering and ManagementVol. 31(1)
Swedish Transport Administration (SE), Norwegian University of Science and Technology (NO), Chalmers University of Technology (SE)
Trafikverket
Industry, innovation and infrastructure, Decent work and economic growth
Openalex Percentile: Top 72%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Do actors’ incentives obstruct sector-wide long-term productivity in the design and production of bridges in Sweden? — Ola Lædre‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌, Peter Simonsson, et al. · Journal of Civil Engineering and Management (2024) | TGRS Research Map | TGRS