Briefing: Reducing regulatory turbulence for US offshore wind development

With the recent announcement of a joint goal among federal agencies to deploy 30 GW of offshore wind capacity by 2030 and the target for the Bureau of Ocean Energy Management (BOEM) to approve the Construction and Operations Plans of at least 16 offshore wind farms by 2025, the US offshore wind industry appears to be on the cusp of a major expansion. However, a literature review of the history and current state of the US offshore wind industry indicates that resource constraints within the BOEM and obstacles posed by the complex regulatory process could prevent the industry from reaching its full potential. A critical analysis was conducted on information and data collected from primary and secondary sources to propose strategies for mitigating and avoiding this regulatory turbulence. This paper concludes that BOEM must increase its bandwidth and accelerate the rate of offshore wind project review and approval by pursuing resource augmentation measures and opportunities to introduce efficiencies into its regulatory approach.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Engineering Sustainability
Published
2024-12-10
DOI
https://doi.org/10.1680/jensu.22.00064
Citations
1
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.34
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Briefing: Reducing regulatory turbulence for US offshore wind development

George Xydis, Mathew Smead
1 citations
Proceedings of the Institution of Civil Engineers - Engineering Sustainability
Marine and Offshore Engineering Studies
0.34
article

Briefing: Reducing regulatory turbulence for US offshore wind development

George Xydis, Mathew Smead
article en
1 citations

Abstract

With the recent announcement of a joint goal among federal agencies to deploy 30 GW of offshore wind capacity by 2030 and the target for the Bureau of Ocean Energy Management (BOEM) to approve the Construction and Operations Plans of at least 16 offshore wind farms by 2025, the US offshore wind industry appears to be on the cusp of a major expansion. However, a literature review of the history and current state of the US offshore wind industry indicates that resource constraints within the BOEM and obstacles posed by the complex regulatory process could prevent the industry from reaching its full potential. A critical analysis was conducted on information and data collected from primary and secondary sources to propose strategies for mitigating and avoiding this regulatory turbulence. This paper concludes that BOEM must increase its bandwidth and accelerate the rate of offshore wind project review and approval by pursuing resource augmentation measures and opportunities to introduce efficiencies into its regulatory approach.

Proceedings of the Institution of Civil Engineers - Engineering SustainabilityVol. 178(3)
Johns Hopkins University (US), University of Peloponnese (GR), Aarhus University (DK)
Affordable and clean energy
Openalex Percentile: Top 38%
Marine and Offshore Engineering Studies
0.34
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.