Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

Maintenance of 20 kV cubicles at PT. Haleyora Powerindo is a crucial step in ensuring the reliability and safety of the electrical distribution system. This process includes preparation stages such as inspecting work equipment, coordinating power outages, and utilizing safety equipment (PPE) to minimize the risk of accidents. Subsequent steps involve voltage disconnection, verifying zero voltage using detection tools, cleaning components with specialized fluids, and drying to ensure that moisture does not cause disruptions. Once all stages are completed, the voltage is carefully reactivated, and a maintenance report is prepared to document the process. This study employs direct observation, interviews, and document analysis to evaluate the maintenance implementation and provide recommendations for quality improvement. The results are expected to serve as a guide for other companies in enhancing the efficiency and reliability of 20 kV cubicle maintenance to ensure a stable electricity supply.

Authors

Institutions

Publication Details

Journal
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Published
2024-12-04
DOI
https://doi.org/10.61132/venus.v2i6.635
Primary Topic
Electrical Fault Detection and Protection
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

Johan Hidayat, Muhammad Fatkhurrokhman
1 links
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Electrical Fault Detection and Protection
article

Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

Johan Hidayat, Muhammad Fatkhurrokhman
article en

Abstract

Maintenance of 20 kV cubicles at PT. Haleyora Powerindo is a crucial step in ensuring the reliability and safety of the electrical distribution system. This process includes preparation stages such as inspecting work equipment, coordinating power outages, and utilizing safety equipment (PPE) to minimize the risk of accidents. Subsequent steps involve voltage disconnection, verifying zero voltage using detection tools, cleaning components with specialized fluids, and drying to ensure that moisture does not cause disruptions. Once all stages are completed, the voltage is carefully reactivated, and a maintenance report is prepared to document the process. This study employs direct observation, interviews, and document analysis to evaluate the maintenance implementation and provide recommendations for quality improvement. The results are expected to serve as a guide for other companies in enhancing the efficiency and reliability of 20 kV cubicle maintenance to ensure a stable electricity supply.

Venus Jurnal Publikasi Rumpun Ilmu Teknik Vol. 2(6)
Sultan Ageng Tirtayasa University (ID)
Openalex Percentile: Top 80%
Electrical Fault Detection and Protection
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo — Johan Hidayat, Muhammad Fatkhurrokhman · Venus Jurnal Publikasi Rumpun Ilmu Teknik  (2024) | TGRS Research Map | TGRS