Factors hindering the implementation of PPP in Iraq

Purpose It is a worldwide phenomenon that infrastructure development is considered a catalyst for a country’s economic growth, enhanced service delivery and improved quality of life. Iraq has a considerable lack of necessary infrastructure. Many developing and developed nations utilise public-private partnerships (PPPs) as a means to address their infrastructure investment requirements. This study, however, uniquely investigates the specific factors hindering the implementation of PPP in Iraq, focusing on Iraq’s distinct political, economic and legislative challenges. Design/methodology/approach A thorough literature review, guided by systematic principles similar to Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA), has been conducted to understand PPP and highlight the factors that can facilitate the effective implementation of PPP around the globe. Afterwards, a questionnaire survey was deployed to relevant stakeholders in Iraq to examine these factors in the specific context of Iraq. Subsequently, in-depth interviews with key Iraqi decision-makers were carried out to discuss the questionnaire results in more detail and pinpoint particular barriers impeding successful PPP implementation in Iraq. These data were then rigorously analysed to highlight Iraq’s unique challenges, and the results were discussed to provide a contextual understanding. Based on these insights, conclusions and recommendations are drawn accordingly. Findings The results revealed that one of the main factors hindering the implementation of PPP in Iraq is the absence of a legal and regulatory framework that can give PPP implementation its legitimacy in Iraq. Other factors include the overall reluctance of several Iraqi legislators towards the PPP system and the unavailability of an environment attractive to investors. Originality/value The findings and recommendations set forth in this research can aid champions of the PPP system within the government of Iraq in devising an effective plan. Unlike similar studies, this paper addresses barriers specific to Iraq, such as political reluctance and regulatory gaps, providing new insights to guide policy. This plan is intended to foster a PPP mindset among relevant lawmakers, ensuring the successful approval of PPP laws and regulatory frameworks.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-12-10
DOI
https://doi.org/10.1108/ecam-03-2023-0311
Citations
2
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
1.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors hindering the implementation of PPP in Iraq

Khaldoon Shehab Al-Tameemi, Sundus Khaleel Alfaiz, Nidhal Al-Sadoon
2 citations
Engineering Construction & Architectural Management
Public-Private Partnership Projects
1.11
article

Factors hindering the implementation of PPP in Iraq

Khaldoon Shehab Al-Tameemi, Sundus Khaleel Alfaiz, Nidhal Al-Sadoon
article en
2 citations

Abstract

Purpose It is a worldwide phenomenon that infrastructure development is considered a catalyst for a country’s economic growth, enhanced service delivery and improved quality of life. Iraq has a considerable lack of necessary infrastructure. Many developing and developed nations utilise public-private partnerships (PPPs) as a means to address their infrastructure investment requirements. This study, however, uniquely investigates the specific factors hindering the implementation of PPP in Iraq, focusing on Iraq’s distinct political, economic and legislative challenges. Design/methodology/approach A thorough literature review, guided by systematic principles similar to Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA), has been conducted to understand PPP and highlight the factors that can facilitate the effective implementation of PPP around the globe. Afterwards, a questionnaire survey was deployed to relevant stakeholders in Iraq to examine these factors in the specific context of Iraq. Subsequently, in-depth interviews with key Iraqi decision-makers were carried out to discuss the questionnaire results in more detail and pinpoint particular barriers impeding successful PPP implementation in Iraq. These data were then rigorously analysed to highlight Iraq’s unique challenges, and the results were discussed to provide a contextual understanding. Based on these insights, conclusions and recommendations are drawn accordingly. Findings The results revealed that one of the main factors hindering the implementation of PPP in Iraq is the absence of a legal and regulatory framework that can give PPP implementation its legitimacy in Iraq. Other factors include the overall reluctance of several Iraqi legislators towards the PPP system and the unavailability of an environment attractive to investors. Originality/value The findings and recommendations set forth in this research can aid champions of the PPP system within the government of Iraq in devising an effective plan. Unlike similar studies, this paper addresses barriers specific to Iraq, such as political reluctance and regulatory gaps, providing new insights to guide policy. This plan is intended to foster a PPP mindset among relevant lawmakers, ensuring the successful approval of PPP laws and regulatory frameworks.

Engineering Construction & Architectural ManagementVol. 33(2)
University of Basrah (IQ)
Partnerships for the goals
Openalex Percentile: Top 14%
Public-Private Partnership Projects
1.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.