Mine design on mangrove block site of Indrabakti Mustika company in Lameruru, North Konawe regency, Southeast Sulawesi province

Abstract The increasing demand for nickel in Indonesia grows with the trend of electric vehicles, inspiring nickel mining companies to enhance their supplies. PT IBM, a company engaged in nickel mining, is operating laterite nickel resource mining activities in a 576-ha area of open-cut mining in the village of Lameruru, North Konawe Regency, Southeast Sulawesi province. The mining activities are divided into several blocks, including a mangrove block to meet the production target of 125,000 WMT ore per month in case other blocks fail to meet the cut-off grade (CoG) of 1.2% Ni. This study recommends a mining design to effectively determine the overburden and ore extracted in the mangrove block. This quantitative research collected data from literature studies and field studies. The results of the mine design revealed eight mining sequences with a total amount of mined overburden and mined ore volume of 1,584,589 BCM and 1,069,481 WMT, respectively. The stripping ratio obtained was 1:1.48, indicating that it takes 1.48 BCM overburden to obtain 1 WMT ore.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2024-12-01
DOI
https://doi.org/10.1088/1755-1315/1422/1/012033
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mine design on mangrove block site of Indrabakti Mustika company in Lameruru, North Konawe regency, Southeast Sulawesi province

Hady Rasikhun, Ariyanto Ariyanto, Ferry Ferry, Erwin Rangga Fitriawan
IOP Conference Series Earth and Environmental Science
Mining Techniques and Economics
article

Mine design on mangrove block site of Indrabakti Mustika company in Lameruru, North Konawe regency, Southeast Sulawesi province

Hady Rasikhun, Ariyanto Ariyanto, Ferry Ferry, Erwin Rangga Fitriawan
article en

Abstract

Abstract The increasing demand for nickel in Indonesia grows with the trend of electric vehicles, inspiring nickel mining companies to enhance their supplies. PT IBM, a company engaged in nickel mining, is operating laterite nickel resource mining activities in a 576-ha area of open-cut mining in the village of Lameruru, North Konawe Regency, Southeast Sulawesi province. The mining activities are divided into several blocks, including a mangrove block to meet the production target of 125,000 WMT ore per month in case other blocks fail to meet the cut-off grade (CoG) of 1.2% Ni. This study recommends a mining design to effectively determine the overburden and ore extracted in the mangrove block. This quantitative research collected data from literature studies and field studies. The results of the mine design revealed eight mining sequences with a total amount of mined overburden and mined ore volume of 1,584,589 BCM and 1,069,481 WMT, respectively. The stripping ratio obtained was 1:1.48, indicating that it takes 1.48 BCM overburden to obtain 1 WMT ore.

IOP Conference Series Earth and Environmental ScienceVol. 1422(1)
University of Muhammadiyah Mataram (ID)
Openalex Percentile: Top 72%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.