Efektivitas Mesin Slitter Dengan Menggunakan Metode OEE di Perusahaan Packaging

XYZ is a company engaged in manufacturing produce packaging products that use machines in the production process. The Slitter machine is one of the main machines in this company's production flow, however, according to research results, downtime often occurs causing the production flow to stop so that losses can occur for the company due to not achieving targets. This research aims to determine the level of effectiveness of the slitter machine at PT. The research method used is an analysis of Overall Equipment Effectiveness calculations and identification of the main causes of low machine effectiveness by applying OEE and Six Big Losses analysis. The results of this research show an OEE value of 81.61% which has not yet reached the ideal World Class condition of 85% and is the biggest factor in the value of losses in Performance Efficiency is 14.606%. Keywords: Downtime, Overall Equipment Effectiveness, Packaging, Six Big Losses.

Authors

Institutions

Publication Details

Journal
Industrika Jurnal Ilmiah Teknik Industri
Published
2024-10-19
DOI
https://doi.org/10.37090/indstrk.v8i4.1492
Citations
1
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.55
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efektivitas Mesin Slitter Dengan Menggunakan Metode OEE di Perusahaan Packaging

Desy Ayu Pahila, Hapid Apid Maksum, Dimas Nurwinata Rinaldi
1 citations
Industrika Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
0.55
article

Efektivitas Mesin Slitter Dengan Menggunakan Metode OEE di Perusahaan Packaging

Desy Ayu Pahila, Hapid Apid Maksum, Dimas Nurwinata Rinaldi
article en
1 citations

Abstract

XYZ is a company engaged in manufacturing produce packaging products that use machines in the production process. The Slitter machine is one of the main machines in this company's production flow, however, according to research results, downtime often occurs causing the production flow to stop so that losses can occur for the company due to not achieving targets. This research aims to determine the level of effectiveness of the slitter machine at PT. The research method used is an analysis of Overall Equipment Effectiveness calculations and identification of the main causes of low machine effectiveness by applying OEE and Six Big Losses analysis. The results of this research show an OEE value of 81.61% which has not yet reached the ideal World Class condition of 85% and is the biggest factor in the value of losses in Performance Efficiency is 14.606%. Keywords: Downtime, Overall Equipment Effectiveness, Packaging, Six Big Losses.

Industrika Jurnal Ilmiah Teknik IndustriVol. 8(4)
University of Singaperbangsa Karawang (ID)
Openalex Percentile: Top 20%
Management and Optimization Techniques
0.55
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.