Perencanaan Bahan Baku Produksi Menggunakan Metode Material Requirement Planning (MRP) Studi Kasus Teh Botol Sosro

Raw material inventory is a serious problem for manufacturing companies. Shortages of raw materials can stop production, while inventories that are too large cause high storage costs and result in idle capital. Therefore, research entitled "Planning Raw Materials for Production of Sosro Bottled Tea Using the Material Requirement Planning (MRP) Method at Sinar Sosro Deli Serdang" was carried out. The aim of this research is to determine the planning of the amount of raw materials needed for production. This research is descriptive with primary and secondary data. The research results show that the raw material requirements for the production of Teh Botol Sosro for the period January 2022-December 2022 are as follows: Sugar 5,213,184 kg, Dry Tea 365,329 kg, Water 6,455,592,000 ml, Bottle Cap/Crown Cork 2,934,600 pcs, Bottles 2,934. 600 pcs, and Krat 1,222,650 pcs. Lot size calculations using the Lot for Lot (LFL) and Period Order Quantity (POQ) methods show that the POQ method is more economical with a minimum cost of IDR 1,944,412.59. Keywords: Lot For Lot, Material Requirement Planning (MRP), Period Order Quantity, Raw Material Planning

Authors

Institutions

Publication Details

Journal
Industrika Jurnal Ilmiah Teknik Industri
Published
2024-10-19
DOI
https://doi.org/10.37090/indstrk.v8i4.1636
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perencanaan Bahan Baku Produksi Menggunakan Metode Material Requirement Planning (MRP) Studi Kasus Teh Botol Sosro

Sarah Stefhanie Simanjuntak, Zaharuddin Zaharuddin, Riana Puspita
Industrika Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
article

Perencanaan Bahan Baku Produksi Menggunakan Metode Material Requirement Planning (MRP) Studi Kasus Teh Botol Sosro

Sarah Stefhanie Simanjuntak, Zaharuddin Zaharuddin, Riana Puspita
article en

Abstract

Raw material inventory is a serious problem for manufacturing companies. Shortages of raw materials can stop production, while inventories that are too large cause high storage costs and result in idle capital. Therefore, research entitled "Planning Raw Materials for Production of Sosro Bottled Tea Using the Material Requirement Planning (MRP) Method at Sinar Sosro Deli Serdang" was carried out. The aim of this research is to determine the planning of the amount of raw materials needed for production. This research is descriptive with primary and secondary data. The research results show that the raw material requirements for the production of Teh Botol Sosro for the period January 2022-December 2022 are as follows: Sugar 5,213,184 kg, Dry Tea 365,329 kg, Water 6,455,592,000 ml, Bottle Cap/Crown Cork 2,934,600 pcs, Bottles 2,934. 600 pcs, and Krat 1,222,650 pcs. Lot size calculations using the Lot for Lot (LFL) and Period Order Quantity (POQ) methods show that the POQ method is more economical with a minimum cost of IDR 1,944,412.59. Keywords: Lot For Lot, Material Requirement Planning (MRP), Period Order Quantity, Raw Material Planning

Industrika Jurnal Ilmiah Teknik IndustriVol. 8(4)
Pelita Harapan University (ID), Universitas Harapan Medan (ID)
Openalex Percentile: Top 61%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.