Nickel mine planning application to support smelter demand fulfilment: a case study of gag nickel mine

Abstract Gag Nickel is a mining project in West Papua developed by Antam, with a total resource of approximately 300 million wet metric tons. In the central block, mining activities are carried out to meet the demand target for the nickel smelter. There are two types of specifications, saprolite and limonite ores, each with specific grade requirement based on sales purchase contract. The aim of this study was to fulfill the long-term target from 2024 to 2028 through integrated mine planning to generate production scheduling plan based on agreed contract of around 6 million wet metric tons ore per year. The quantitative method was implemented to gather primary data, including the 6-meter-high bench and material classification based on specific quality of elements-compounds, and to use the secondary data such as reserve block model to create a reverse model. The challenges of this study included different ore specifications of each location of the hill, and constraints on limited stockyard location to support differentiation between two types of products. Based on the simulations performed, production and sales targets could be achieved according to predetermined product specifications, amounting to 6 million wet metric tons of saprolite and limonite with fluctuating processes during the period. From the scheduling results, the smelter supply composition ratio between saprolite and limonite was between 1.37 and 1.85. After the implementation above, Gag Nickel can conserve resources by optimizing reserves of both limonite and saprolite for optimum utilization.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2024-12-01
DOI
https://doi.org/10.1088/1755-1315/1422/1/012026
Primary Topic
Metal Extraction and Bioleaching
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Nickel mine planning application to support smelter demand fulfilment: a case study of gag nickel mine

Desnila Sari, Gembong Suryo Wibowo, A Milwadi
IOP Conference Series Earth and Environmental Science
Metal Extraction and Bioleaching
article

Nickel mine planning application to support smelter demand fulfilment: a case study of gag nickel mine

Desnila Sari, Gembong Suryo Wibowo, A Milwadi
article en

Abstract

Abstract Gag Nickel is a mining project in West Papua developed by Antam, with a total resource of approximately 300 million wet metric tons. In the central block, mining activities are carried out to meet the demand target for the nickel smelter. There are two types of specifications, saprolite and limonite ores, each with specific grade requirement based on sales purchase contract. The aim of this study was to fulfill the long-term target from 2024 to 2028 through integrated mine planning to generate production scheduling plan based on agreed contract of around 6 million wet metric tons ore per year. The quantitative method was implemented to gather primary data, including the 6-meter-high bench and material classification based on specific quality of elements-compounds, and to use the secondary data such as reserve block model to create a reverse model. The challenges of this study included different ore specifications of each location of the hill, and constraints on limited stockyard location to support differentiation between two types of products. Based on the simulations performed, production and sales targets could be achieved according to predetermined product specifications, amounting to 6 million wet metric tons of saprolite and limonite with fluctuating processes during the period. From the scheduling results, the smelter supply composition ratio between saprolite and limonite was between 1.37 and 1.85. After the implementation above, Gag Nickel can conserve resources by optimizing reserves of both limonite and saprolite for optimum utilization.

IOP Conference Series Earth and Environmental ScienceVol. 1422(1)
Nickel Institute (CA), Mineral Resources (AU), Chongqing Institute of Geology and Mineral Resources (CN)
Openalex Percentile: Top 53%
Metal Extraction and Bioleaching
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Nickel mine planning application to support smelter demand fulfilment: a case study of gag nickel mine — Desnila Sari, Gembong Suryo Wibowo, et al. · IOP Conference Series Earth and Environmental Science (2024) | TGRS Research Map | TGRS