Collaborative scheduling algorithm for full quantity materials based on process and machine learning

Participants in the supply chain may have different information, leading to incomplete or inaccurate information when making decisions. To this end, a process and machine learning based collaborative scheduling algorithm for all materials is proposed. Design a health monitoring process for material supply chain based on R-tree dynamic indexing algorithm. Based on this, artificial neural networks in machine learning are applied to mine the data of the entire material supply chain. Through data mining, various data in the supply chain can be integrated and analyzed to improve information transparency and accuracy, and reduce information asymmetry. Adopting a dual layer scheduling model to achieve dual layer collaborative scheduling of materials. The experimental results show that the research method effectively improves the accuracy of data mining in the entire material supply chain, and the utilization rate of materials under this method is always higher than 95%.

Authors

Institutions

Publication Details

Published
2024-09-13
DOI
https://doi.org/10.1145/3700906.3700996
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Collaborative scheduling algorithm for full quantity materials based on process and machine learning

S. Gu
1 links
Manufacturing Process and Optimization
article

Collaborative scheduling algorithm for full quantity materials based on process and machine learning

S. Gu
article en

Abstract

Participants in the supply chain may have different information, leading to incomplete or inaccurate information when making decisions. To this end, a process and machine learning based collaborative scheduling algorithm for all materials is proposed. Design a health monitoring process for material supply chain based on R-tree dynamic indexing algorithm. Based on this, artificial neural networks in machine learning are applied to mine the data of the entire material supply chain. Through data mining, various data in the supply chain can be integrated and analyzed to improve information transparency and accuracy, and reduce information asymmetry. Adopting a dual layer scheduling model to achieve dual layer collaborative scheduling of materials. The experimental results show that the research method effectively improves the accuracy of data mining in the entire material supply chain, and the utilization rate of materials under this method is always higher than 95%.

State Grid Corporation of China (China) (CN)
Openalex Percentile: Top 68%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Collaborative scheduling algorithm for full quantity materials based on process and machine learning — S. Gu · (2024) | TGRS Research Map | TGRS