Penerapan metode fuzzy analytical hierarchy process pada penentuan prioritas perawatan komponen jalan rel

This study uses the fuzzy analytical hierarchy process (FAHP) method to determine the maintenance priorities of railroad components on the section between Caruban Station - Babadan Station KM 155+000 to KM 157+200. FAHP was applied to evaluate and prioritize based on criteria including human resources, material, cost, risk, and level of damage, with participation from experts and academics. FAHP analysis showed that risk was the first-order criterion in priority assessment with a value of 0.31, followed by damage level with a value of 0.29, cost with a value of 0.17, material with a value of 0.14, and human resources with a value of 0.10. The resulting maintenance prioritization shows that ballast addition is the most urgent measure with the highest priority value of 0.54, followed by rail and sleeper maintenance with values of 0.27 and 0.18 respectively. The results of this analysis indicate a need for 1,456.60 m3 of additional ballast as a priority measure in the repair of railroad components in the studied segments.

Authors

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2024-10-15
DOI
https://doi.org/10.31004/jutin.v7i4.35323
Primary Topic
Decision Support System Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Penerapan metode fuzzy analytical hierarchy process pada penentuan prioritas perawatan komponen jalan rel

Muhammad Adib Kurniawan, Septiana Widi Astuti, Windi Nopryanto, Puspita Dewi et al.
Jurnal Teknik Industri Terintegrasi
Decision Support System Applications
article

Penerapan metode fuzzy analytical hierarchy process pada penentuan prioritas perawatan komponen jalan rel

Muhammad Adib Kurniawan, Septiana Widi Astuti, Windi Nopryanto, Puspita Dewi, Renaldy Yoga Septiyoko
article en

Abstract

This study uses the fuzzy analytical hierarchy process (FAHP) method to determine the maintenance priorities of railroad components on the section between Caruban Station - Babadan Station KM 155+000 to KM 157+200. FAHP was applied to evaluate and prioritize based on criteria including human resources, material, cost, risk, and level of damage, with participation from experts and academics. FAHP analysis showed that risk was the first-order criterion in priority assessment with a value of 0.31, followed by damage level with a value of 0.29, cost with a value of 0.17, material with a value of 0.14, and human resources with a value of 0.10. The resulting maintenance prioritization shows that ballast addition is the most urgent measure with the highest priority value of 0.54, followed by rail and sleeper maintenance with values of 0.27 and 0.18 respectively. The results of this analysis indicate a need for 1,456.60 m3 of additional ballast as a priority measure in the repair of railroad components in the studied segments.

Jurnal Teknik Industri TerintegrasiVol. 7(4)
Openalex Percentile: Top 65%
Decision Support System Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.