Preservasi jalan secara long segment ruas jalan Wawotobi – Lasolo

The implementation of long segment-based contracts which is considered new for service users and large contractors, the implementation of roads. So it is necessary to understand the system. The parties have difficulty implementing the standards that have been determined and understanding the scope of the work being carried out, resulting in the implementation of long segment-based work not being carried out effectively until now. Seeing the above problems, this research was carried out to The method used in this study uses the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 service providers at the Southeast Sulawesi Road Implementation CenterThe method used in this study used the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 providers Factors of understanding from Officials Commitment Makers (PPK) as service users place understanding in contract law as the dominant factor with weight (0.195), while service providers/contractors place the ability to understand contract law as the dominant factor with weight (0.206).

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Terintegrasi
Published
2024-10-15
DOI
https://doi.org/10.31004/jutin.v7i4.35257
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preservasi jalan secara long segment ruas jalan Wawotobi – Lasolo

Putra Sakti, Nasrul Nasrul
Jurnal Teknik Industri Terintegrasi
Urban Transport Systems Analysis
article

Preservasi jalan secara long segment ruas jalan Wawotobi – Lasolo

Putra Sakti, Nasrul Nasrul
article en

Abstract

The implementation of long segment-based contracts which is considered new for service users and large contractors, the implementation of roads. So it is necessary to understand the system. The parties have difficulty implementing the standards that have been determined and understanding the scope of the work being carried out, resulting in the implementation of long segment-based work not being carried out effectively until now. Seeing the above problems, this research was carried out to The method used in this study uses the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 service providers at the Southeast Sulawesi Road Implementation CenterThe method used in this study used the Importance perpormance analysis (IPA) questionnaire method. In accordance with the limitations of this study, the number of respondents used was 30 service users and 30 providers Factors of understanding from Officials Commitment Makers (PPK) as service users place understanding in contract law as the dominant factor with weight (0.195), while service providers/contractors place the ability to understand contract law as the dominant factor with weight (0.206).

Jurnal Teknik Industri TerintegrasiVol. 7(4)
Universitas Nahdlatul Ulama Surakarta (ID), Universitas Lakidende (ID)
Openalex Percentile: Top 75%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.