RECLAMATION COST CALCULATION OF PT. X IN SORONG CITY, SOUTHWEST PAPUA PROVINCE

Reclamation is an effort carried out throughout the mining process to organize, restore, and enhance the quality of the environment and ecosystem, so that the area can function again according to its intended purpose. In the mining industry, companies are required to conduct reclamation. Before carrying out reclamation, the company must calculate the required reclamation costs. PT. X is one of the companies engaged in andesite mining, which is administratively located in Saoka Village, Maladumes District, Sorong City, Southwest Papua Province. After completing the mining activities, PT. X will carry out reclamation by planting pine trees during the period from 2024 to 2028. Based on this, it is necessary to calculate the reclamation costs to determine the expenses the company will incur for this activity. The reclamation cost calculations are based on the Minister of Energy and Mineral Resources Decree Number 1827/K/30/MEM/2018, which outlines the guidelines for implementing Good Mining Engineering Principles. Reclamation costs consist of both direct and indirect costs. Based on the research findings, the total direct and indirect costs that PT. X must incur for reclamation activities from 2024 to 2028 are IDR 359,238,257 and IDR 119,972,490, respectively. Therefore, the total reclamation costs PT. X will incur for the reclamation activities from 2024 to 2028 amount to IDR 479,210,747

Authors

Publication Details

Journal
INTAN Jurnal Penelitian Tambang
Published
2024-12-07
DOI
https://doi.org/10.56139/intan.v7i2.205
Primary Topic
Water and Land Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RECLAMATION COST CALCULATION OF PT. X IN SORONG CITY, SOUTHWEST PAPUA PROVINCE

RInda Wati Iriani Sinaga
INTAN Jurnal Penelitian Tambang
Water and Land Management
article

RECLAMATION COST CALCULATION OF PT. X IN SORONG CITY, SOUTHWEST PAPUA PROVINCE

RInda Wati Iriani Sinaga
article en

Abstract

Reclamation is an effort carried out throughout the mining process to organize, restore, and enhance the quality of the environment and ecosystem, so that the area can function again according to its intended purpose. In the mining industry, companies are required to conduct reclamation. Before carrying out reclamation, the company must calculate the required reclamation costs. PT. X is one of the companies engaged in andesite mining, which is administratively located in Saoka Village, Maladumes District, Sorong City, Southwest Papua Province. After completing the mining activities, PT. X will carry out reclamation by planting pine trees during the period from 2024 to 2028. Based on this, it is necessary to calculate the reclamation costs to determine the expenses the company will incur for this activity. The reclamation cost calculations are based on the Minister of Energy and Mineral Resources Decree Number 1827/K/30/MEM/2018, which outlines the guidelines for implementing Good Mining Engineering Principles. Reclamation costs consist of both direct and indirect costs. Based on the research findings, the total direct and indirect costs that PT. X must incur for reclamation activities from 2024 to 2028 are IDR 359,238,257 and IDR 119,972,490, respectively. Therefore, the total reclamation costs PT. X will incur for the reclamation activities from 2024 to 2028 amount to IDR 479,210,747

INTAN Jurnal Penelitian TambangVol. 7(2)
Openalex Percentile: Top 66%
Water and Land Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.