A robust single-machine scheduling problem with scenario-dependent processing times and release dates

Many uncertainties arise during the manufacturing process, such as changes in the working environment, traffic transportation delays, machine breakdowns, and worker performance instabilities. These factors can cause job processing times and ready times to change. In this study, we address a scheduling model for a single machine where both job release dates and processing times are scenario dependent. The objective is to minimize the total completion time across the worst-case scenarios. Even without the uncertainty factor, this problem is NP-hard. To solve it, we derive several properties and a lower bound used in a branch-and-bound method to find an optimal solution. We propose nine heuristics based on a linear combination of scenario-dependent processing times and release times for approximate solutions. Additionally, we offer an iterated greedy population-based algorithm that efficiently solves this problem by taking advantage of the diversity of solutions. We evaluate the performance of the proposed nine heuristics and the iterated greedy population-based algorithm.

Authors

Publication Details

Journal
International Journal of Industrial Engineering Computations
Published
2024-12-06
DOI
https://doi.org/10.5267/j.ijiec.2024.11.002
Citations
1
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.35

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A robust single-machine scheduling problem with scenario-dependent processing times and release dates

Yu-Hsiang Chung, Zong-Lin Wu, Tao Ren, Xingong Zhang et al.
1 citations
International Journal of Industrial Engineering Computations
Scheduling and Optimization Algorithms
0.35
article

A robust single-machine scheduling problem with scenario-dependent processing times and release dates

Yu-Hsiang Chung, Zong-Lin Wu, Tao Ren, Xingong Zhang, Win-Chin Lin, Juin-Han Chen, Chin‐Chia Wu
article en
1 citations

Abstract

Many uncertainties arise during the manufacturing process, such as changes in the working environment, traffic transportation delays, machine breakdowns, and worker performance instabilities. These factors can cause job processing times and ready times to change. In this study, we address a scheduling model for a single machine where both job release dates and processing times are scenario dependent. The objective is to minimize the total completion time across the worst-case scenarios. Even without the uncertainty factor, this problem is NP-hard. To solve it, we derive several properties and a lower bound used in a branch-and-bound method to find an optimal solution. We propose nine heuristics based on a linear combination of scenario-dependent processing times and release times for approximate solutions. Additionally, we offer an iterated greedy population-based algorithm that efficiently solves this problem by taking advantage of the diversity of solutions. We evaluate the performance of the proposed nine heuristics and the iterated greedy population-based algorithm.

International Journal of Industrial Engineering ComputationsVol. 16(1)
National Natural Science Foundation of China, Ministry of Science and Technology, Taiwan, National Science and Technology Council, Division of Graduate Education
Openalex Percentile: Top 33%
Scheduling and Optimization Algorithms
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A robust single-machine scheduling problem with scenario-dependent processing times and release dates — Yu-Hsiang Chung, Zong-Lin Wu, et al. · International Journal of Industrial Engineering Computations (2024) | TGRS Research Map | TGRS