You are entitled to access the full text of this documentA novel hybrid algorithm of cooperative variable neighborhood search and constraint programming for flexible job shop scheduling problem with sequence dependent setup time

This study focuses on the flexible job shop scheduling problem with sequence-dependent setup times (FJSP-SDST), and the goal is minimizing the makespan. To solve FJSP-SDST, first, we develop a constraint programming (CP) model to obtain optimal solutions. Due to the NP-hardness of FJSP-SDST, a CP assisted meta-heuristic algorithm (C-VNS-CP) is designed to make use of the advantages of both CP model and cooperative variable neighborhood search (C-VNS). The C-VNS-CP algorithm consists of two stages. The first stage involves C-VNS, for which eight neighborhood structures are defined. In the second stage, CP is used to further optimize the good solution obtained from C-VNS. In order to prove the efficiency of the C-VNS algorithm, CP model, and C-VNS-CP algorithm, experiments of 20 instances are conducted.

Authors

Publication Details

Journal
International Journal of Industrial Engineering Computations
Published
2024-12-06
DOI
https://doi.org/10.5267/j.ijiec.2024.11.003
Citations
4
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
1.40

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

You are entitled to access the full text of this documentA novel hybrid algorithm of cooperative variable neighborhood search and constraint programming for flexible job shop scheduling problem with sequence dependent setup time

Peng Duan, Weiyao Cheng, Biao Zhang, Leilei Meng et al.
4 citations
International Journal of Industrial Engineering Computations
Scheduling and Optimization Algorithms
1.40
article

You are entitled to access the full text of this documentA novel hybrid algorithm of cooperative variable neighborhood search and constraint programming for flexible job shop scheduling problem with sequence dependent setup time

Peng Duan, Weiyao Cheng, Biao Zhang, Leilei Meng, Yajie Wu, Shiming Yang
article en
4 citations

Abstract

This study focuses on the flexible job shop scheduling problem with sequence-dependent setup times (FJSP-SDST), and the goal is minimizing the makespan. To solve FJSP-SDST, first, we develop a constraint programming (CP) model to obtain optimal solutions. Due to the NP-hardness of FJSP-SDST, a CP assisted meta-heuristic algorithm (C-VNS-CP) is designed to make use of the advantages of both CP model and cooperative variable neighborhood search (C-VNS). The C-VNS-CP algorithm consists of two stages. The first stage involves C-VNS, for which eight neighborhood structures are defined. In the second stage, CP is used to further optimize the good solution obtained from C-VNS. In order to prove the efficiency of the C-VNS algorithm, CP model, and C-VNS-CP algorithm, experiments of 20 instances are conducted.

International Journal of Industrial Engineering ComputationsVol. 16(1)
National Natural Science Foundation of China, Liaocheng University, Natural Science Foundation of Shandong Province
Decent work and economic growth
Openalex Percentile: Top 16%
Scheduling and Optimization Algorithms
1.40
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.