THE SOLUTION TO THE PROJECT SCHEDULING PROBLEM BY USING AN IMPROVED GENETIC ALGORITHM
Nowadays, managing and allocating resources for projects has become increasingly essential for managers. A critical factor affecting the success of a project is the work assignment plan for workers to optimize the completion time. Current solutions to project scheduling problems have not been thoroughly addressed; thus, in this study, we model the labor assignment process in project production as a scheduling problem. To solve this problem, we use an improved genetic algorithm named GA-RT (Genetic Algorithm with Random Crossover and Negative Tournament Selection) and conduct experiments on the iMOPSE standard dataset. Experimental results show that the proposed GA-RT algorithm can effectively solve the project scheduling problem, achieving better performance compared to existing algorithms.
Authors
- Huu Dang Quoc (ORCID: https://orcid.org/0000-0001-5197-8066)
- Loc Nguyen The (ORCID: https://orcid.org/0000-0001-8386-272X)
- Trần Thanh Thiên Trúc
- Do Ba Chin
Institutions
- Hanoi National University of Education (VN)
- Thuongmai University (VN)
- VNU University of Science (VN)
Publication Details
- Journal
- Journal of Science Natural Science
- Published
- 2024-10-31
- DOI
- https://doi.org/10.18173/2354-1059.2024-0035
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Bộ Giáo dục và Ðào tạo
- Đại học Quốc gia Hà Nội