Analisa Kebutuhan Daya Listrik Terpasang Pada Perusahaan Perumda Air Minum Kabupaten Lamongan

PDAM Lamongan is a regional company that provides clean water to serve comsumers/customers. This research is analyzing the electrical power needs of this company. Researchers used literature study methods and field observation. The data sources needed are data collection through interviews and direct observation. This analysis uses the KWH method. The results obtained are used as material for analysis using the SEC (Specific Energy Consumption) theory, so that it can show the condition/efficiency of this company. Research results of the electricity source from a PLN transformer of 240 KVA. The main panel MCCB of 350 A is divided into 5 groups, namely group 1-5 using submersible and group 5 adds AC load and 2 lighting lamps. The total load power is 84.831 Watts. The total power requirement for one month is 61.026 KWH and the monthly rupiah cost is Rp.68.478.009,48. The results of the SEC (Specific Energy Consumption) calculation which is 0,098 KWH/ are concluded to be in the criteria for average efficiency because the results are below 0,4 KWH/ according to the JICA Ministry’s efficiency book standard which is 0,4 KWH/.

Authors

Institutions

Publication Details

Journal
El Sains Jurnal Elektro
Published
2024-11-24
DOI
https://doi.org/10.30996/elsains.v6i2.11529
Primary Topic
Engineering and Technology Innovations
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisa Kebutuhan Daya Listrik Terpasang Pada Perusahaan Perumda Air Minum Kabupaten Lamongan

Arief Budi Laksono, Bambang Irwanto Warno
El Sains Jurnal Elektro
Engineering and Technology Innovations
article

Analisa Kebutuhan Daya Listrik Terpasang Pada Perusahaan Perumda Air Minum Kabupaten Lamongan

Arief Budi Laksono, Bambang Irwanto Warno
article en

Abstract

PDAM Lamongan is a regional company that provides clean water to serve comsumers/customers. This research is analyzing the electrical power needs of this company. Researchers used literature study methods and field observation. The data sources needed are data collection through interviews and direct observation. This analysis uses the KWH method. The results obtained are used as material for analysis using the SEC (Specific Energy Consumption) theory, so that it can show the condition/efficiency of this company. Research results of the electricity source from a PLN transformer of 240 KVA. The main panel MCCB of 350 A is divided into 5 groups, namely group 1-5 using submersible and group 5 adds AC load and 2 lighting lamps. The total load power is 84.831 Watts. The total power requirement for one month is 61.026 KWH and the monthly rupiah cost is Rp.68.478.009,48. The results of the SEC (Specific Energy Consumption) calculation which is 0,098 KWH/ are concluded to be in the criteria for average efficiency because the results are below 0,4 KWH/ according to the JICA Ministry’s efficiency book standard which is 0,4 KWH/.

El Sains Jurnal ElektroVol. 6(2)
Universitas Islam Lamongan (ID)
Affordable and clean energy
Openalex Percentile: Top 80%
Engineering and Technology Innovations
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.