Understanding Geotechnical Embankment Washout Due to Overtopping: Insights From Physical Tests

Abstract Understanding the erosion process of an earth dam and flood embankment composed of noncohesive, homogeneous soils due to overflow is crucial for determining the quantity and rate of water release. This is necessary to assess the consequences of a failure, analyze the risk, and develop appropriate crisis management procedures. Despite numerous studies in this area, the process of breach evolution is not fully explored. The article presents the results of physical experiments carried out in the field laboratory of the Wrocław University of Science and Technology for a dam with a height of 0.50 m that closes a reservoir with a capacity of 14.4 m 3 , whose width is significantly greater than the final width of the breach. The scenario analyzed assumes that water overflows the embankment crest, as it is the most common cause of embankment failure based on dam disaster databases. At the same time, the amount of water accumulated in the reservoir is the largest possible for this scenario, suggesting that such a catastrophe may have the most severe consequences. Based on the results obtained from three experiments, four repeatable phases of erosion evolution were identified and described: (I) the initiation phase, (II) the vertical erosion phase, (III) the lateral erosion phase, divided into two cycles, and (IV) the reservoir emptying phase without further propagation of the breach. The outflow rate of the water from the reservoir was also analyzed, allowing the determination of the outflow hydrograph for each test. Hydrographs showed differences between individual experiments; however, the average erosion rate was similar for all tests. Furthermore, the final width of the breach created each time was between 2.2 and 2.5 H (where H is the height of the embankment) and the volume of eroded soil ranged from 0.52 to 0.59 m 3 . The article also highlights the methodology to calculate the water outflow hydrograph.

Authors

Institutions

Publication Details

Journal
Studia Geotechnica et Mechanica
Published
2024-12-01
DOI
https://doi.org/10.2478/sgem-2024-0025
Citations
1
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.26
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Understanding Geotechnical Embankment Washout Due to Overtopping: Insights From Physical Tests

Stanisław Kostecki, Mikołaj Urbaniak, Krzysztof Zamiar
1 citations
Studia Geotechnica et Mechanica
Dam Engineering and Safety
0.26
article

Understanding Geotechnical Embankment Washout Due to Overtopping: Insights From Physical Tests

Stanisław Kostecki, Mikołaj Urbaniak, Krzysztof Zamiar
article en
1 citations

Abstract

Abstract Understanding the erosion process of an earth dam and flood embankment composed of noncohesive, homogeneous soils due to overflow is crucial for determining the quantity and rate of water release. This is necessary to assess the consequences of a failure, analyze the risk, and develop appropriate crisis management procedures. Despite numerous studies in this area, the process of breach evolution is not fully explored. The article presents the results of physical experiments carried out in the field laboratory of the Wrocław University of Science and Technology for a dam with a height of 0.50 m that closes a reservoir with a capacity of 14.4 m 3 , whose width is significantly greater than the final width of the breach. The scenario analyzed assumes that water overflows the embankment crest, as it is the most common cause of embankment failure based on dam disaster databases. At the same time, the amount of water accumulated in the reservoir is the largest possible for this scenario, suggesting that such a catastrophe may have the most severe consequences. Based on the results obtained from three experiments, four repeatable phases of erosion evolution were identified and described: (I) the initiation phase, (II) the vertical erosion phase, (III) the lateral erosion phase, divided into two cycles, and (IV) the reservoir emptying phase without further propagation of the breach. The outflow rate of the water from the reservoir was also analyzed, allowing the determination of the outflow hydrograph for each test. Hydrographs showed differences between individual experiments; however, the average erosion rate was similar for all tests. Furthermore, the final width of the breach created each time was between 2.2 and 2.5 H (where H is the height of the embankment) and the volume of eroded soil ranged from 0.52 to 0.59 m 3 . The article also highlights the methodology to calculate the water outflow hydrograph.

Studia Geotechnica et MechanicaVol. 46(4)
Wrocław University of Science and Technology (PL), AGH University of Krakow (PL)
Openalex Percentile: Top 42%
Dam Engineering and Safety
0.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.