A joint work package sizing and scheduling problem considering resource constraints with a look-ahead heterogeneous reinforcement learning method

Effective work package sizing and project scheduling are crucial for construction project management. However, existing studies often address them as separate optimisation problems, neglecting the interactive nature of these processes. In practical scenarios with limited resources, there is an increasing demand for integrating work package sizing and project scheduling to enhance project management efficiency. This research aims to bridge this gap by developing an integer non-linear programming model that incorporates work package sizing and project scheduling while considering their interaction within a resource-constrained environment. Moreover, we introduce a novel look-ahead heterogeneous reinforcement learning approach that dynamically adjusts work package sizes and project schedules based on observed information at each decision step. A look-ahead sequential decision mechanism is proposed to effectively address the interdependencies and constraints inherent in the joint model. We extend the heterogeneous agent mirror learning technique to our problem to improve sample efficiency and ensure progressive enhancement of the joint policy. To evaluate our approach's effectiveness, we conduct experiments using datasets of 15, 30, 60, 90, and 120 tasks from Rangen and PSPLIB and validate our method in a real-world modular integrated construction project. The experimental results reveal that a joint model integrating work package sizing and project scheduling offers a more comprehensive understanding of their interplay, leading to better resource utilisation and improved project schedules. A comparative analysis against existing state-of-the-art reinforcement learning and priority rule-based methods further substantiates the superior effectiveness of our proposed approach, yielding an approximate 5% reduction in total project cost.

Authors

Institutions

Publication Details

Journal
International Journal of Production Research
Published
2024-12-04
DOI
https://doi.org/10.1080/00207543.2024.2430457
Citations
2
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.98

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A joint work package sizing and scheduling problem considering resource constraints with a look-ahead heterogeneous reinforcement learning method

Nianmin Zhang, Xiaolu Li, Gao Yao
2 citations
International Journal of Production Research
Resource-Constrained Project Scheduling
0.98
article

A joint work package sizing and scheduling problem considering resource constraints with a look-ahead heterogeneous reinforcement learning method

Nianmin Zhang, Xiaolu Li, Gao Yao
article en
2 citations

Abstract

Effective work package sizing and project scheduling are crucial for construction project management. However, existing studies often address them as separate optimisation problems, neglecting the interactive nature of these processes. In practical scenarios with limited resources, there is an increasing demand for integrating work package sizing and project scheduling to enhance project management efficiency. This research aims to bridge this gap by developing an integer non-linear programming model that incorporates work package sizing and project scheduling while considering their interaction within a resource-constrained environment. Moreover, we introduce a novel look-ahead heterogeneous reinforcement learning approach that dynamically adjusts work package sizes and project schedules based on observed information at each decision step. A look-ahead sequential decision mechanism is proposed to effectively address the interdependencies and constraints inherent in the joint model. We extend the heterogeneous agent mirror learning technique to our problem to improve sample efficiency and ensure progressive enhancement of the joint policy. To evaluate our approach's effectiveness, we conduct experiments using datasets of 15, 30, 60, 90, and 120 tasks from Rangen and PSPLIB and validate our method in a real-world modular integrated construction project. The experimental results reveal that a joint model integrating work package sizing and project scheduling offers a more comprehensive understanding of their interplay, leading to better resource utilisation and improved project schedules. A comparative analysis against existing state-of-the-art reinforcement learning and priority rule-based methods further substantiates the superior effectiveness of our proposed approach, yielding an approximate 5% reduction in total project cost.

International Journal of Production ResearchVol. 63(10)
Hefei University of Technology (CN), University of Hong Kong (HK)
National Natural Science Foundation of China, University of Hong Kong
Openalex Percentile: Top 20%
Resource-Constrained Project Scheduling
0.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.