Risk warning method for the whole process of production project based on multi-source data mining

Aiming at the problem that the correlation coefficient between the final screening early warning indicators is small in the whole process of risk index screening of production projects, a risk early warning method for the whole process of production projects based on multi-source data mining is proposed. The multi-source data mining technology is used to extract the potential hidden characteristics of risk indicators in the whole process of production projects, and the hidden characteristic relationship between multi-risk indicators is obtained, and the risk management index system of the whole process of production projects is established. Risk warning of the whole process of production projects. The test results show that the proposed risk early warning method has a larger cross-correlation coefficient calculated in each index group, which verifies that the early warning method has high application reliability, can obtain more accurate data, and improve the early warning accuracy.

Authors

Institutions

Publication Details

Journal
International Journal of Innovation and Sustainable Development
Published
2024-12-03
DOI
https://doi.org/10.1504/ijisd.2025.143053
Citations
1
Primary Topic
Collaboration in agile enterprises
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk warning method for the whole process of production project based on multi-source data mining

Shaohuan Cheng, Jiefeng Wen, Jinlei Hu, Mingjie Zhang et al.
1 citations
International Journal of Innovation and Sustainable Development
Collaboration in agile enterprises
0.73
article

Risk warning method for the whole process of production project based on multi-source data mining

Shaohuan Cheng, Jiefeng Wen, Jinlei Hu, Mingjie Zhang, Xinping Luo, Ya Zhou
article en
1 citations

Abstract

Aiming at the problem that the correlation coefficient between the final screening early warning indicators is small in the whole process of risk index screening of production projects, a risk early warning method for the whole process of production projects based on multi-source data mining is proposed. The multi-source data mining technology is used to extract the potential hidden characteristics of risk indicators in the whole process of production projects, and the hidden characteristic relationship between multi-risk indicators is obtained, and the risk management index system of the whole process of production projects is established. Risk warning of the whole process of production projects. The test results show that the proposed risk early warning method has a larger cross-correlation coefficient calculated in each index group, which verifies that the early warning method has high application reliability, can obtain more accurate data, and improve the early warning accuracy.

International Journal of Innovation and Sustainable DevelopmentVol. 19(1)
China Southern Power Grid (China) (CN)
Climate action
Openalex Percentile: Top 21%
Collaboration in agile enterprises
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.