Determining the Time and Volume of Supply of Materials for the Production of Asphalt Concrete Mixtures

The paper deals with material supply scheduling models for asphalt concrete mix production. It is shown that planning the supply of raw materials relies primarily on the economic criterion, which is considered the minimum expected average loss, including the cost of material storage and loss of profits due to lack of materials in storage at the right time. The most common systems are described that allow automating the processes of planning, inventory control, and choosing the best strategy for restocking materials for the entire assortment to minimize the actual losses or anticipated costs. Models are presented to determine the losses from the storage of materials in the asphalt concrete plant warehouse and the losses incurred due to their absence.

Authors

Institutions

Publication Details

Published
2024-11-13
DOI
https://doi.org/10.1109/tirved63561.2024.10769890
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determining the Time and Volume of Supply of Materials for the Production of Asphalt Concrete Mixtures

Maxim M. Nikitaev, Maria A. Brezhneva, Georgy Malazonia, Yuri Vasiliev et al.
Industrial Engineering and Technologies
article

Determining the Time and Volume of Supply of Materials for the Production of Asphalt Concrete Mixtures

Maxim M. Nikitaev, Maria A. Brezhneva, Georgy Malazonia, Yuri Vasiliev, Igor E. Sahakyan
article en

Abstract

The paper deals with material supply scheduling models for asphalt concrete mix production. It is shown that planning the supply of raw materials relies primarily on the economic criterion, which is considered the minimum expected average loss, including the cost of material storage and loss of profits due to lack of materials in storage at the right time. The most common systems are described that allow automating the processes of planning, inventory control, and choosing the best strategy for restocking materials for the entire assortment to minimize the actual losses or anticipated costs. Models are presented to determine the losses from the storage of materials in the asphalt concrete plant warehouse and the losses incurred due to their absence.

Moscow Automobile and Road Construction State Technical University (RU)
Openalex Percentile: Top 78%
Industrial Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.