ANALYSIS OF THE IMPLEMENTATION OF IMPROVEMENT OF TUBE MATERIAL HANDLING TO SPEED UP THE PICKING PROCESS AT THE RAW MATERIAL WAREHOUSE OF PT. DSV SOLUTIONS INDONESIA (SEMARANG BRANCH)

Warehouses that store various types of materials such as raw materials, semi-finished goods, and finished goods play an important role in the company's logistics system. Warehouse activities are highly dependent on the speed and accuracy of material and information management. This study aims to evaluate the activities of tube material handling strategies in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch with a focus on identifying activities, impacts on time and costs, as well as risks and obstacles in the tube material picking process. The company's target is to complete 100% within 5 hours, but during July-December 2023 the target has not been achieved. This research uses a qualitative approach, data collection through observation, interviews, and documentation conducted with qualitative analysis. The results of the research on material handling tubes in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch show that the current storage system is not optimal. The material picking and sorting process is less than optimal when the material is stored in the original box from the customer which contains several SKUs (Stock Keeping Units). As a result, one retrieval process takes 100 minutes and costs Rp 30,720 in employee salaries. In addition, the current storage system risks hindering the achievement of company targets, extending process time, and increasing the risk of material damage. The conclusion of this study is that the tube material handling strategy in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch is not optimal and needs improvement regarding storage. The use of more organised material handling in tube material storage can improve picking activities and reduce processing time, costs, and the risk of material damage.

Authors

Institutions

Publication Details

Journal
Journal of Artificial Intelligence and Digital Economy
Published
2024-09-30
DOI
https://doi.org/10.61796/jaide.v1i9.700
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALYSIS OF THE IMPLEMENTATION OF IMPROVEMENT OF TUBE MATERIAL HANDLING TO SPEED UP THE PICKING PROCESS AT THE RAW MATERIAL WAREHOUSE OF PT. DSV SOLUTIONS INDONESIA (SEMARANG BRANCH)

Agung Budiatmo, Dinda Ovelyta Hutauruk
Journal of Artificial Intelligence and Digital Economy
Advanced Manufacturing and Logistics Optimization
article

ANALYSIS OF THE IMPLEMENTATION OF IMPROVEMENT OF TUBE MATERIAL HANDLING TO SPEED UP THE PICKING PROCESS AT THE RAW MATERIAL WAREHOUSE OF PT. DSV SOLUTIONS INDONESIA (SEMARANG BRANCH)

Agung Budiatmo, Dinda Ovelyta Hutauruk
article en

Abstract

Warehouses that store various types of materials such as raw materials, semi-finished goods, and finished goods play an important role in the company's logistics system. Warehouse activities are highly dependent on the speed and accuracy of material and information management. This study aims to evaluate the activities of tube material handling strategies in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch with a focus on identifying activities, impacts on time and costs, as well as risks and obstacles in the tube material picking process. The company's target is to complete 100% within 5 hours, but during July-December 2023 the target has not been achieved. This research uses a qualitative approach, data collection through observation, interviews, and documentation conducted with qualitative analysis. The results of the research on material handling tubes in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch show that the current storage system is not optimal. The material picking and sorting process is less than optimal when the material is stored in the original box from the customer which contains several SKUs (Stock Keeping Units). As a result, one retrieval process takes 100 minutes and costs Rp 30,720 in employee salaries. In addition, the current storage system risks hindering the achievement of company targets, extending process time, and increasing the risk of material damage. The conclusion of this study is that the tube material handling strategy in the Raw Material Warehouse of PT DSV Solutions Indonesia Semarang Branch is not optimal and needs improvement regarding storage. The use of more organised material handling in tube material storage can improve picking activities and reduce processing time, costs, and the risk of material damage.

Journal of Artificial Intelligence and Digital EconomyVol. 1(9)
Diponegoro University (ID)
Openalex Percentile: Top 69%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

ANALYSIS OF THE IMPLEMENTATION OF IMPROVEMENT OF TUBE MATERIAL HANDLING TO SPEED UP THE PICKING PROCESS AT THE RAW MATERIAL WAREHOUSE OF PT. DSV SOLUTIONS INDONESIA (SEMARANG BRANCH) — Agung Budiatmo, Dinda Ovelyta Hutauruk · Journal of Artificial Intelligence and Digital Economy (2024) | TGRS Research Map | TGRS