PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PEKERJAAN PLESTERAN (Studi Kasus : Proyek Pembangunan Masjid Babbusalam Sabil Barakah)

A project is a temporary activity that has clear goals and objectives, lasts for a limited period of time, with a certain cost allocation. This research was conducted to find out how much labor productivity there is in plastering work on the Babbusalam Sabil Barakah Mosque construction project and what factors influence the productivity of plastering work on the Babbusalam Sabil Barakah Mosque construction project. The research was conducted by observing the productivity level of 32 workers and accompanied by filling out a questionnaire. Productivity observations used the work sampling method by calculating worker utility factors which were carried out for 3 days for each worker. The average value of the worker productivity utility factor in plastering work on the Babbusalam Sabil Barakah Mosque construction project is 89.57%. The variables that have been determined have a significance of 0.000<0.005 (the required sig) so that they simultaneously have an influence on the level of productivity. Partially, 9 factors that influence the productivity variable have a calculated T value for each variable that exceeds the T table value of 2.074.

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Sipil LATERAL
Published
2024-11-20
DOI
https://doi.org/10.52333/lateral.v2i2.339
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PEKERJAAN PLESTERAN (Studi Kasus : Proyek Pembangunan Masjid Babbusalam Sabil Barakah)

Verinazul Septriansyah, Zuul Fitriana Umari, Kgs. M. Widi Atmiko, Bazar Asmawi
Jurnal Teknik Sipil LATERAL
Geotechnical and construction materials studies
article

PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP PEKERJAAN PLESTERAN (Studi Kasus : Proyek Pembangunan Masjid Babbusalam Sabil Barakah)

Verinazul Septriansyah, Zuul Fitriana Umari, Kgs. M. Widi Atmiko, Bazar Asmawi
article en

Abstract

A project is a temporary activity that has clear goals and objectives, lasts for a limited period of time, with a certain cost allocation. This research was conducted to find out how much labor productivity there is in plastering work on the Babbusalam Sabil Barakah Mosque construction project and what factors influence the productivity of plastering work on the Babbusalam Sabil Barakah Mosque construction project. The research was conducted by observing the productivity level of 32 workers and accompanied by filling out a questionnaire. Productivity observations used the work sampling method by calculating worker utility factors which were carried out for 3 days for each worker. The average value of the worker productivity utility factor in plastering work on the Babbusalam Sabil Barakah Mosque construction project is 89.57%. The variables that have been determined have a significance of 0.000<0.005 (the required sig) so that they simultaneously have an influence on the level of productivity. Partially, 9 factors that influence the productivity variable have a calculated T value for each variable that exceeds the T table value of 2.074.

Jurnal Teknik Sipil LATERALVol. 2(2)
Universitas Tridinanti Palembang (ID), Universitas Muhammadiyah Palembang (ID)
Decent work and economic growth
Openalex Percentile: Top 75%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.